Installation
2
Installation
2.1 Installation Process
The BoX2 base can be used as a as a bench top device or clipped onto a DIN rail.
The following is needed:
•
No tools required - standard usage
1. Unpack and check the delivery. If damage is found, notify the supplier.
Note:
Place the operator panel on a stable surface during installation.
Dropping the operator panel or letting it fall may cause damage.
Beijer Electronics, MAEN274
11
Содержание BoX2 extreme
Страница 1: ...BoX2 base Installation Manual English MAEN274 2018 03...
Страница 2: ......
Страница 4: ...Foreword Beijer Electronics MAEN274...
Страница 6: ...Contents Beijer Electronics MAEN274...
Страница 14: ...Installation 14 Beijer Electronics MAEN274...
Страница 16: ...Technical Data 16 Beijer Electronics MAEN274...
Страница 18: ...Chemical Resistance 18 Beijer Electronics MAEN274...
Страница 28: ...Head office Beijer Electronics AB Box 426 201 24 Malm Sweden www beijerelectronics com 46 40 358600...