background image

Planung von Notlichtanlagen 

Für die Planung solcher Leuchten ist der 

Lichtstrom im Notlichtbetrieb entscheidend. 

Die Lichtströme für den Notlichtbetrieb 

finden Sie in den Datenblättern der zu 

diesem Pollerleuchtenrohr kombinierbaren 

Pollerleuchtenköpfe.

Planning emergency lighting systems 

The luminous flux during emergency lighting 

operation is an essential factor for the planning 

of these luminaires. The luminous flux for 

emergency lighting operations can be found in 

the data sheets of the bollard heads suitable for 

this bollard tube.

Lumineux du module fonctionnement de 

secours

Pour la planification de tels luminaires, le 

flux lumineux d’un éclairage de secours en 

mode éclairage de secours est décisif. Le flux 

lumineux en autonomie en mode secours vous 

le  trouverez dans les fiches techniques de 

têtes de balises combinables.

Ergänzungsteile
70

 

896 

Erdstück  

mit Befestigungsflansch aus feuerverzinktem 

Stahl. Gesamtlänge 500 mm.  

3 Befestigungsschrauben M8 aus Edelstahl. 

Teilkreis  ø 132 mm.

Accessories
70

 

896 

Anchorage unit  

with mounting flange made of hot-dip 

galvanised steel. Overall length 500 mm.  

3 stainless steel M8 mounting screws.  

Pitch  circle  ø 132 mm.

Accessoires
70

 

896 

Pièce à enterrer  

avec bride de fixation en acier galvanisé. 

 

Longueur totale 500 mm. 

 

3 vis de fixation M8 en acier inoxydable. 

Entraxe Ø 132 mm.

Es gibt dazu eine gesonderte 

Gebrauchsanweisung.

See the separate instructions for use.

Une fiche d’utilisation pour ces accessoires est 

disponible.

Ersatzteile

Montageplatte 

22 299 9L

Notlichteinsatz 

61 108 0

Akkumulator 

61 120 8

Spares

Mounting  plate 

22 299 9L

Emergency  kit 

61 108 0

Rechargeable  battery 

61 120 8

Pièces de rechange

Contre-plaque 

22 299 9L

Kit de sécurité 

61 108 0

Accumulateur 

61 120 8

Содержание 99666

Страница 1: ...3 flame resistant and self extinguishing Clear housing cover with screw mounting with integral indicator LED 3 cable entries with two part plastic gasket and integrated strain relief for underground cable 5 x 2 5 5 x 16 2 loose plug in terminals for connecting DALI control cables max 4 2 3 m fixed connecting cable 10 G 1 for electrical connection of the bollard head Emergency lighting module with ...

Страница 2: ...uminaire in maintained mode you must insert a bridge between L1 and L on site Insert the plug part of the indicator LED and fit the housing cover Connection of the connection cable to the bollard head The 5 wire connection cable which is connected as standard must be removed from the bollard head Undo the Allen screws and lift the connection housing from the luminaire head Disconnect the wires und...

Страница 3: ...ichtversorgungs gerät EM converterLED unter www tridonicatco com Startup procedure After installation of the luminaire and initial connection of the mains supply and battery supply to the EM converterLED the unit will commence charging the batteries for 20 hours initial charge Afterwards the module will conduct a startup procedure test for the full duration The 20 hours recharge occurs also if a n...

Страница 4: ... to operate with rated operating time After discharging of the accumulator a recharge period of 12 hours is required The average life time of the accumulator is 4 years If the accumulator does no longer fullfil the requirements of its rated normal operating time refer to status display the accumulator must be replaced For replacing the accumulator the fixing screws and the plug connection must be ...

Страница 5: ...ours vous le trouverez dans les fiches techniques de têtes de balises combinables Ergänzungsteile 70 896 Erdstück mit Befestigungsflansch aus feuerverzinktem Stahl Gesamtlänge 500mm 3 Befestigungsschrauben M8 aus Edelstahl Teilkreis ø132mm Accessories 70 896 Anchorage unit with mounting flange made of hot dip galvanised steel Overall length 500 mm 3 stainless steel M8 mounting screws Pitch circle ...

Отзывы: