background image

 

Table of contents 

 

 

Embedded PC 

Table of contents 

1. Foreword 

Notes on the documentation 

Safety instructions 

Documentation issue status 

2. Product overview 

Appropiate use 

System overview 

Basic modules 

Technical data 

CX900x-0xxx (E-bus)

 

10

 

CX900x-1xxx (K-bus)

 

11

  

CX9010-0xxx (E-bus)

 

12

 

CX9010-1xxx (K-bus)

 

13

 

Configurations CX9000 

14 

Configurations CX9010 

15 

Connections 16 

Battery compartment 

20 

DIP switch settings 

21 

System interfaces 

24 

Technical data 

24 

Connections CX9000-N010 

25 

Connections CX9000-N030 

27 

Connections CX9000-N031 

28 

3. Transport 

31 

Unpacking, installation and transport 

31 

4.  Assembly and connecting 

32 

Mechanical assembly 

32 

Dimensions 32 

Mechanical assembly of basic module 

35 

Mechanical assembly of UPS module 

37 

Start-up procedure 

40 

Start-up procedure 

40 

5.  Error handling and diagnostics 

41 

CPU basic module 

41 

LED basic module E-Bus 

41 

LED basic module K-Bus 

42 

K-Bus diagnosis with TwinCAT 

44 

6. Decomissioning 

46 

Removal and disposal 

46 

Содержание CX90 0 Series

Страница 1: ...Hardware documentation for CX90x0 Ethernet controller CX900x xxxx CX901x xxxx CX90x0 Nxxx version 2 4 date 2008 06 11...

Страница 2: ......

Страница 3: ...compartment 20 DIP switch settings 21 System interfaces 24 Technical data 24 Connections CX9000 N010 25 Connections CX9000 N030 27 Connections CX9000 N031 28 3 Transport 31 Unpacking installation and...

Страница 4: ...Table of contents 2 Embedded PC 7 Appendix 48 Update image 48 Accessories 57 Certifications 58 Support and service 59...

Страница 5: ...pment For that reason the documentation is not in every case checked for consistency with performance data standards or other characteristics None of the statements of this manual represents a guarant...

Страница 6: ...s symbol is intended to highlight risks for the life or health of personnel Warning This symbol is intended to highlight risks for equipment materials or the environment Note This symbol indicates inf...

Страница 7: ...operator must initiate such inspections in good time Operator requirements Read the operating instructions All users of the product must have read the operating instructions for the system they work w...

Страница 8: ...added 2 0 notes on UL added 1 9 order information changed 1 8 notes on K Bus diagnosis added 1 7 notes on USV and CF card handling added title picture changed 1 6 Notes on software image update 1 5 ca...

Страница 9: ...loss on the hard disk Please read the section on Switching off Switch off all system components and uncouple the Industrial PC from the system if the PC is not used for control purposes e g during a f...

Страница 10: ...interfaces This simplifies wiring of several CX9000 within a line topology No separate switch hardware is required The two externally accessible Ethernet ports are independent of the EtherCAT interfac...

Страница 11: ...rmat I and II is available as an optional module only in combination with system interface CX90x0 N010 The operating system is Microsoft Windows CE The TwinCAT automation software transforms a CX90x0...

Страница 12: ...CE Control software TwinCAT CE PLC Runtime or TwinCAT CE NC PTP Runtime Power supply 24 VDC 15 20 To meet the UL requirements use a 4 A fuse or a power supply that has to satisfy NEC class 2 Dielectr...

Страница 13: ...CE Control software TwinCAT CE PLC Runtime or TwinCAT CE NC PTP Runtime Power supply 24 VDC 15 20 To meet the UL requirements use a 4 A fuse or a power supply that has to satisfy NEC class 2 Dielectr...

Страница 14: ...AT CE PLC Runtime or TwinCAT CE NC PTP Runtime Power supply 24 VDC 15 20 To meet the UL requirements use a 4 A fuse or a power supply that has to satisfy NEC class 2 Dielectric strength 500 Vrms suppl...

Страница 15: ...AT CE PLC Runtime or TwinCAT CE NC PTP Runtime Power supply 24 VDC 15 20 To meet the UL requirements use a 4 A fuse or a power supply that has to satisfy NEC class 2 Dielectric strength 500 Vrms suppl...

Страница 16: ...AM 32 MB Flash 128 MB RAM E Bus K Bus DVI 2 x USB no TwinCAT TwinCAT PLC Runtime TwinCAT NC Runtime CX9000 0000 X x X CX9000 0001 X x x CX9000 1000 X x x CX9000 1001 X x x CX9001 0000 x x x CX9001 000...

Страница 17: ...configurations are available Ordering information E Bus K Bus DVI 2 x USB no TwinCAT TwinCAT PLC Runtime TwinCAT NC Runtime CX9010 0000 x x CX9010 0001 x x CX9010 0002 x x x CX9010 0100 x x x CX9010...

Страница 18: ...ts Danger For the compliance of the UL requirements the CX Controllers should only be supplied by a 24 VDC supply voltage supplied by an isolating source and protected by means of a fuse in accordance...

Страница 19: ...ports of a basic CPU module must not be connected to the same external switch Note Only for use in LAN not for connection to telecommunication circuits Schematic structure of the network components T...

Страница 20: ...as terminal bus CX900x 1xxx the second MAC interface is not connected Operating system perspective The operating system only sees one of the connections for the network interface The status is always...

Страница 21: ...tion to the two Ethernet ports this basic module also features DVI USB interfaces The pin assignment of the basic CPU module with two USB and a DVI I interface is explained under the associated CX9000...

Страница 22: ...ollowing specification Electrical properties at 20 C Standard charge Dimensions Battery type nominal voltage nominal capacity continuous load Diameter Height Weight CR2032 3 0 V 225 mAh 0 20 mA 20 00...

Страница 23: ...tween two ethernet ports It can be opened with the aid of a screwdriver proceed carefully in order to avoid damage Once the compartment is opened the four dip switches can be accessed They are located...

Страница 24: ...a serial monitor device printer or terminal to COM1 port The settings for the interface are 38400 baud 8 bits NO parity and 1 stop bit 38400 8 N 1 3 Connect CX System to power and boot system Debug m...

Страница 25: ...necessary to start TwinCAT in Config mode So the boot project can be corrected or other settings can be re setted 1 Set dip switch 4 to ON move switch 4 up 2 Connect CX System to power and boot system...

Страница 26: ...hey are supplied ex factory in the specified configuration and cannot be separated from the CPU module The system interfaces run through the internal PC104 bus so that further CX components can be con...

Страница 27: ...he screen or the Beckhoff Control Panel depends on the distance maximum 5 m The DVI interface uses VGA signals so that the connection of CRT VGA monitors to the CX System using a DVI to VGA adapter is...

Страница 28: ...Out C4 Analog Horizontal Sync Resolution at the monitor Resolution in pixels Distance of the interface from the monitor 1600 x 1200 5 m 1280 x 1024 5 m 1024 x 768 5 m 800 x 600 5 m 640 x 480 5 m USB i...

Страница 29: ...connector Pin assignment COM interface PIN Signal Type Description 1 DCD Signal in Data Carrier Detected 2 RxD Signal in Receive Data 3 TxD Signal out Transmit Data 4 DTR Signal out Data Terminal Read...

Страница 30: ...t for all interfaces is equal and described below The interface parameter can be set in the operating system or in the PLC program RS232 COM interface connector Pin assignment COM interface PIN Signal...

Страница 31: ...he parameter for the lower interface The system must be powered down if the settings of the switches are changed The settings for default use should be mentioned by ordering the interface module Setti...

Страница 32: ...nd on 4 off Always send on 5 off Auto receive on 6 on Always receive on 7 off Term on 8 off Term on Setting DIP Switches RS422 RS422 full duplex end point DIP Status Function 1 on Echo on 2 off Echo o...

Страница 33: ...ny shipping damage or inconsistencies between the contents and your order you should notify Beckhoff Service Achtung Danger of damage to the unit During transport in cold conditions or if the unit is...

Страница 34: ...dbus interfaces have to be provided The overall width of the application is made up of the individual modules With a height of 100 mm the module dimensions exactly match those of the Beckhoff Bus Term...

Страница 35: ...Assembly and connecting Embedded PC 33 CX9000 N0x0 System interfaces CX1100 09x0 UPS module CX1100 0900...

Страница 36: ...Assembly and connecting 34 Embedded PC CX1100 0910 CX1100 0920...

Страница 37: ...pulled down before attaching to the top hat rail This can be done using an ordinary screwdriver and a slight turn Then fix the CX9000 block on the top hat rail using the latching straps You should he...

Страница 38: ...Mounting must provide a clearance of 30 mm both above and below a CX System device combination to ensure adequate ventilation of the base CPU module and the power supply unit Correct installation posi...

Страница 39: ...be disconnected 1 Removing from the top hat rail Before the individual CX9000 modules are disconnected the whole CX9000 hardware block should be removed from the top hat rail Proceed as follows 1 1 Re...

Страница 40: ...handled carefully in order to avoid damage When correctly assembled no significant gap can be seen between the attached housings If the modules are assembled the cover can be replaced 2 2 Engaging on...

Страница 41: ...e CX System After successful latching on the top hat rail the straps should be pushed back to their original position 2 3 Connecting the Embedded PC to the terminal bus By reinstalling the once remove...

Страница 42: ...first time the pre installed operating system optional will be started Switching off The Embedded PC switches off when the power supply unit is switched off The control software typically running on...

Страница 43: ...n STOP mode green TwinCAT is in RUN mode blue TwinCAT is in CONFIG mode PWR off System is offline LAN 1 LAN Link green LINK ACTIVITY for first switched LAN PORT CX9000_N000 LAN 2 LAN Link green LINK A...

Страница 44: ...OM checksum error Revert to the manufacturer s setting 1 Code buffer overflow Insert fewer Bus Terminals The programmed configuration has too many entries in the table 1 pulse 2 Unknown data type Soft...

Страница 45: ...ower supply up again 16 pulses n Length of the K Bus data is no longer correct Start the power supply up again Error code argument The number of pulses indicates the position of the last Bus Terminal...

Страница 46: ...k_bus_state AT IB2 USINT END_VAR In the PLC program the analysis can be done as follows this is only pseudo code IF k_bus_state 1 THEN an error occured on K Bus k_bus_request TRUE request vaules for E...

Страница 47: ...gain To make the control work the register and the program must be linked in System Manager If the PLC program is attached in System Manager the following signals are available Analog the registers of...

Страница 48: ...ove the first Terminal next to the power supply unit on the top hat rail First remove any wiring from power supply unit and then from the first terminal on the top hat rail next to the power supply un...

Страница 49: ...module latching mechanism pushing them apart The plug connectors of the PC 104 interface can then be pulled apart carefully Only modules CPU fieldbus connections and UPS modules that can be separated...

Страница 50: ...rver tool on the host pc this tool is listening on network to be connected from CX9000 device 4 The initial activity to get a new image is started by the CX9000 device This will happen if CX9000 is co...

Страница 51: ...to Boot Strap Mode set a DIP switch on CX9000 start a program to set the CX9000 into Boot Strap Mode Prepare the CX9000 to start in boot strap mode 1 Power down the CX9000 2 Open the battery compartme...

Страница 52: ...ctory though this range is mapped into the RAM regions instead of the hard disc located in flash memory For operation the system must be rebooted Just follow the instructions on the screen After resta...

Страница 53: ...in network The batch file will start a command shell and prompt Waiting for download request 5 Phases during image update Start CX90x0 to initiate the download procedure Initial phase Start CX90x0 to...

Страница 54: ...thout involving company network or 2 The image server can be configured to let CX directly request image from specific IP address Step 1 connect CX9000 with PC get IP address of PC like 192 16 18 123...

Страница 55: ...te via Ethernet Activate the FTP server on the CX if not it is disabled The necessary configuration is shown below It is a good idea to choose Temp or Public as target directory though this range is m...

Страница 56: ...twork drive In this case you should map the drive to the CX9000 If the image is copied to the CX9000 or the network drive is mapped to the system the update tool can be started by double click on the...

Страница 57: ...confirm the image file This is the last chance to abort the update process When confirming the image file a warning appears on the screen The progress is shown in the status line in the bottom of the...

Страница 58: ...Appendix 56 Embedded PC The CX9000 can be rebooted now If the system has started again it can be used as before The update tool and the image are removed if they were copied on the RAM drive...

Страница 59: ...29 pin male DVI A connector bottom to 15 pin female connector top weight approx 40 g dimensions W x H x D 40 x 42 x 15 mm Labeling Tags order number Description CX1900 0200 Universal plastic labels fo...

Страница 60: ...mily are CE UL and GOST R certified Since the product family is continuously developed further we are unable to provide a full listing here The current list of certified products can be found on the E...

Страница 61: ...nts Hotline 49 0 5246 963 157 Fax 49 0 5246 963 9157 e mail support beckhoff com Beckhoff Service The Beckhoff Service Center supports you in all matters of after sales service on site service repair...

Отзывы: