background image

Maintenance

CP32xx-2xxx-0020

35

Version: 1.1

6.2.2

Replacing the storage media

New storage media should only be obtained from Beckhoff Service (see Chapter 9.1 Service and support).

In the High Performance Class, the CP32xx is equipped with the following storage media:

• one SSD, 3D-Flash in TLC configuration, 2.5-inch, 512 GB

• one SSD, 3D-Flash in TLC configuration, 2.5-inch, 1 TB

In the Smart Performance Class, the CP32xx is equipped with the following storage medium:

• one SSD, 3D-Flash in TLC configuration, 2.5-inch, 512 GB

Data transfer before replacement

If you want to exchange the SSD as recommended by Beckhoff, you must copy the data from the old to the
new SSD. You can use the Beckhoff Service Tool (BST) for this purpose. The BST is a graphical backup and
restore program for Industrial PCs with a Windows operating system. You can create an image of your
operating system and use it to back up the operating system. You can then restore the images created in
this way. You will receive the BST on a BST stick. For more information on the function of the BST, please
refer to the corresponding documentation.

If your SSD is defective and there is no backup, Beckhoff Service can provide you with a fresh Windows
image. For this to be possible, the Beckhoff PC must already have been shipped with a valid operating
system license. When installing the fresh image, the applications must be reinstalled.

Replacing the storage media

Chapter 6.2.1 

Access to device components [

}

 33]

 shows how to access the storage media.

On the storage media there are stickers that protrude beyond the storage media. To replace the storage
media, pull them out of the device by the stickers (see Fig. 23). Then plug the new storage media into the
device in the same direction.

Fig. 23: CP32xx_replacing storage media

The old storage media must be disposed of in accordance with the national electronic waste regulations.

Содержание CP32 -2 -0020 Series

Страница 1: ...Manual EN CP32xx 2xxx 0020 Panel PC 3 26 2021 Version 1 1...

Страница 2: ......

Страница 3: ...2 Mounting 16 4 2 1 Dimensions 18 4 2 2 Mounting arm installation 19 4 2 3 Mounting the keyboard shelf 21 4 2 4 Mounting the adapter housing 22 4 3 Connecting the Panel PC 22 4 3 1 Grounding the Panel...

Страница 4: ...Table of contents CP32xx 2xxx 0020 4 Version 1 1...

Страница 5: ...AT EtherCAT EtherCAT P Safety over EtherCAT TwinSAFE XFC and XTS are registered and licensed brands of Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use...

Страница 6: ...ty notice will lead to death or serious injuries WARNING Disregarding the safety notice may lead to death or serious injuries CAUTION Disregarding the safety notice may lead to minor injuries Warning...

Страница 7: ...ower consumption and power dissipation please refer to the respective data sheet Ensure that only trained qualified persons with a control and automation technology background operate the device Use b...

Страница 8: ...r touch screen and an aluminum housing with all round IP65 protection There is an adapter on the housing for mounting arm installation on the C9900 M80x The device is available in the High Performance...

Страница 9: ...ion of the Panel PC 3 Heat sink Access to the motherboard 4 Mounting arm adapter Adapter for installation on mounting arm 5 Toggle switch Switching the power supply on and off 6 Power supply XD01 Conn...

Страница 10: ...rew caps from the housing see Fig 2 A B C Fig 2 CP32xx_access to interfaces 3 2 1 Power supply The Panel PC is supplied with a rated voltage of 24 V The connection of the power supply as well as the e...

Страница 11: ...is a connection cable inside the column unit of the mounting arm If the Panel PC is used alone this cable is intended for the Ethernet connection of the PC If the C900 M800 key extension is also used...

Страница 12: ...s provide up to 500 mA the USB 3 0 interfaces up to 900 mA They are electronically fused 1 2 3 4 5 6 9 78 1 2 3 4 5 6 9 78 1 2 3 4 5 6 9 78 1 2 3 4 5 6 9 78 Fig 5 CP32xx_USB interface pin numbering Ta...

Страница 13: ...le 5 Key name plate CP32xx No Description 1 Model The last four digits indicate the device generation 2 Serial number BTN 3 Date of manufacture 4 Mainboard 5 CPU 6 Main memory 7 Hard disk 8 MAC addres...

Страница 14: ...pply cable for CP32xx 2xxx length 0 75 m pre assembled Harting push pull power plug IP 65 other end Harting push pull power plug IP 65 C9900 K791 Power supply cable for CP32xx 2xxx length 0 85 m pre a...

Страница 15: ...t the components are sensitive to strong vibrations and impacts During transport the device must therefore be protected from mechanical stress Appropriate packaging of the Panel PC in particular the o...

Страница 16: ...options Order identifier Execution C9900 M802 Mounting arm for mounting on ceiling C9900 M803 Stand for mounting on the control cabinet C9900 M804 Stand for mounting on hall floors C9900 M805 Bracket...

Страница 17: ...pter Section A 2 Place the rotary adapter between the holding brackets of the standard adapter Section B 3 Insert the two screws of the standard adapter again section C You have now mounted the rotary...

Страница 18: ...ligning the device on the mounting arm All dimensions are in mm Fig 10 illustrates the dimensions of the 18 5 inch Panel PC 352 02 282 13 457 93 94 28 Fig 10 CP32xx_dimensions 18 5 inch Fig 11 illustr...

Страница 19: ...0 M803 C9900 M804 and C9900 M805 mounting arms Proceed as follows to mount the Panel PC on the mounting arm 1 Remove the lower screw of the mounting arm adapter Section A 2 Hook the device into the mo...

Страница 20: ...B C Fig 13 CP32xx_mounting on mounting arm variant 2 If you have chosen the rotary adapter with lever in order to be able to rotate the device on the mounting arm the installation is done in the same...

Страница 21: ...key extension using the drill holes on the underside of the C9900 M800 C C A B Fig 14 CP32xx_keyboard shelf mounting options Mount the keyboard shelf directly below the PC or directly below the key e...

Страница 22: ...the following point Never connect or disconnect the device cables during a thunderstorm To make the Panel PC ready for operation you have to connect it The first step is to ground the device Then you...

Страница 23: ...2xxx 0020 23 Version 1 1 The EMC of the device is improved by functional earthing The functional earth is established via the grounding bolts on the mounting arm adapter Use cables with a minimum cro...

Страница 24: ...HAN connection socket with the Harting HAN plug From there the voltage cables and Ethernet cables are fed through the mounting arms upwards to the opening see Figure 17 Plug the plugs protruding out o...

Страница 25: ...ible voltage drop on the supply cable we recommend connecting the maximum possible cross section In the case of longer distances between the voltage source and the PC take into account the voltage dro...

Страница 26: ...self afterwards If you have ordered the PC without an operating system you must install this and the driver software for the additional hardware you have connected and for the devices in the PC yourse...

Страница 27: ...Panel PC during a thunderstorm can lead to electric shocks Never disconnect the cables of the of the Panel PC during a thunderstorm Before you remove the Panel PC you must follow the steps below 1 Shu...

Страница 28: ...1 Remove the lower screw of the mounting arm adapter with which it is screwed to the mounting arm Section A 2 Swivel the device into an angled position so that the lower part of the mounting arm adap...

Страница 29: ...er housing remove the two screws from the holding brackets with which the housing is fastened to the back of the Panel PC Disposal of the Panel PC When disposing of the Panel PC be sure to observe the...

Страница 30: ...y Cleaning and maintenance by replacing certain device components contribute to this Repair Only the manufacturer may repair the device If a repair should be necessary contact Beckhoff Service see Cha...

Страница 31: ...als years UPS battery pack 5 years 2 5 inch hard disk 5 years or after 20 000 operating hours at more than 40 C or after 30 000 operating hours at less than 40 C 3 5 inch hard disk 5 years irrespectiv...

Страница 32: ...lly dissipating equipment and operating materials e g tools within the ESD protection zone If it is not possible to create an ESD protection zone you can still protect the device against ESD damage Th...

Страница 33: ...rews section A 2 Remove the cover flap section B You now have access to the storage media A B Fig 20 CP32xx_access to storage media Access to battery and fans Access is gained to the battery and fans...

Страница 34: ...Maintenance CP32xx 2xxx 0020 34 Version 1 1 1 2 Fig 22 CP32xx_battery and fans...

Страница 35: ...image of your operating system and use it to back up the operating system You can then restore the images created in this way You will receive the BST on a BST stick For more information on the functi...

Страница 36: ...t contain a lithium ion battery The motherboard battery is a CR2032 lithium metal cell It is used to supply power to the clock integrated on the motherboard If the battery is depleted or missing the d...

Страница 37: ...3 To replace the fans follow the steps below as shown in Figure 25 1 Remove the two Torx TX10 screws from each fan to release the fans from the fan plate section A 2 Remove the fans from the fan plate...

Страница 38: ...rk properly The cause of the error is the software or plant parts outside of the Panel PC Call the machine or software manufacturer The Panel PC only works partially or only temporarily e g dark image...

Страница 39: ...bration EN 60068 2 6 10 to 58 Hz 0 035 mm 58 to 500 Hz 0 5 G 5 m s2 Shock resistance shock EN 60068 2 27 5 G 50 m s2 duration 30 ms EMC interference immunity conforms to EN 61000 6 2 EMC interference...

Страница 40: ...r which you can find on the name plate Beckhoff Support Support offers you comprehensive technical assistance helping you not only with the application of individual Beckhoff products but also with ot...

Страница 41: ...al environment This device generates uses and may emit radio frequency energy and may cause adverse interference with radio communications if it is not installed and used in accordance with the operat...

Страница 42: ...11 CP32xx_dimensions 24 inch 18 Fig 12 CP32xx_mounting on mounting arm variant 2 19 Fig 13 CP32xx_mounting on mounting arm variant 2 20 Fig 14 CP32xx_keyboard shelf mounting options 21 Fig 15 CP32xx_...

Страница 43: ...in assignment 11 Table 4 USB interface pin assignment 12 Table 5 Key name plate CP32xx 13 Table 6 Power supply connection cable 14 Table 7 Ethernet connection cable 14 Table 8 Mounting arm ordering op...

Страница 44: ......

Страница 45: ...Beckhoff Automation GmbH Co KG H lshorstweg 20 33415 Verl Germany Phone 49 5246 9630 info beckhoff com www beckhoff com...

Отзывы: