Becker Avionics
Installation
Post Installation Check
DV64460.03 Issue 11 January 2019
REU6100
93
2.19 Post Installation Check
Once the device/system is installed completely do a test procedure to make sure the system
functionality. Make sure that the compliance with the authority required procedures is obeyed.
The description that follows gives guidance for such tests.
Mechanical Installation and Wiring Check
•
Verify all cables are securely fixed and shields connected properly to ground.
•
Check the movement of all controls to verify there is no interference.
•
Verify all screws are tight, check if all connections are mechanically secured.
Power Supply
•
Check the power supply lines and confirm correct polarity. Don´t apply reverse voltage!
•
Confirm that the aircraft power supply is within the specified limits, with and without a
running engine.
Power On Check
•
Power-up the aircraft systems and confirm normal operation of all functions of the
REU6100.
•
For ACU610X devices refer to the operation section of the ACU610X manual for specific
operational details (
www.becker-avionics.com/downloads/
→
Intercom).
Содержание REU6100
Страница 12: ...Installation and Operation Becker Avionics 12 REU6100 DV64460 03 Issue 11 January 2019 Blank Page...
Страница 34: ...General Description Becker Avionics Order Code 34 REU6100 DV64460 03 Issue 11 January 2019 Blank Page...
Страница 60: ...Installation Becker Avionics Wiring REU6100 ACU610X 60 REU6100 DV64460 03 Issue 11 January 2019 Blank Page...
Страница 94: ...Installation Becker Avionics Post Installation Check 94 REU6100 DV64460 03 Issue 11 January 2019 Blank Page...
Страница 105: ...Becker Avionics Operating Instructions Contact Data DV64460 03 Issue 11 January 2019 REU6100 105 Blank Page...