Beck 901 EX Series Скачать руководство пользователя страница 2

 

 

General instructions 

Safety instructions

 

 

 

 
 

Beck GmbH 
Druckkontrolltechnik 
Ferdinand-Steinbeis-Straße 4 
71144 Steinenbronn

 

 

Telephone 
Telefax 
E-Mail 
Internet  
 
VAT-no. 

+49 7157 52 87-0 
+49 7157 52 87-83 
[email protected] 
http://www.beck-sensors.com 
 
DE162391354 

Bank Accounts 

Kreissparkasse Esslingen-Nürtingen (BLZ 611 500 20) 57 011 970 
S.W.I.F.T. ESSLDE66  IBAN: DE33 6115 0020 0057 0119 70 
Commerzbank Stuttgart (BLZ 600 400 71) 876 179 300 
S.W.I.F.T. COBADEFF600  IBAN: DE70 6004 0071 0876 1793 00 
Landesbank Baden-Württemberg (BLZ 600 501 01) 2 214 306 
S.W.I.F.T. SOLADEST  IBAN: DE36 6005 0101 0002 2143 06 
UniCredit Bank - HypoVereinsbank Stuttgart (BLZ 600 202 90) 388 773 332 
S.W.I.F.T. HYVEDEMM473  IBAN: DE66 6002 0290 0388 7733 32 

Location: Steinenbronn 
Amtsgericht Böblingen HRB 6050 
Managing Directors: Rainer Beck, 
Hans-Peter Funk, Dr. Ernst Thielicke 

 

 

 

Operating instructions – Pressure Switch – Model - 901...EX 

Rev.10 

Page 2 of 18 

 

 
 

 

1

 

General instructions .............................................................................................................3

 

1.1

 

Safety instructions ............................................................................................................3

 

1.1.1

 

General safety instructions ........................................................................................................ 3

 

1.1.2

 

Safety instructions for potentially explosive areas ..................................................................... 4

 

1.1.3

 

Notes on environmental protection ............................................................................................ 4

 

2

 

Correct purpose of use ........................................................................................................5

 

2.1

 

Application area ................................................................................................................5

 

2.2

 

CE conformity ...................................................................................................................5

 

3

 

Storage and transportation ..................................................................................................6

 

3.1

 

Packaging ........................................................................................................................6

 

3.2

 

Storage and transportation conditions ..............................................................................6

 

4

 

Installation .............................................................................................................................6

 

4.1

 

Installation ........................................................................................................................7

 

4.2

 

Connection .......................................................................................................................7

 

5

 

Start-up ..................................................................................................................................9

 

5.1

 

Parameterisation ..............................................................................................................9

 

6

 

Maintenance / service ...........................................................................................................9

 

6.1

 

Time intervals ...................................................................................................................9

 

6.2

 

Troubleshooting .............................................................................................................. 10

 

7

 

Repairs ................................................................................................................................ 10

 

8

 

Dismantling ......................................................................................................................... 10

 

8.1

 

Disposal ......................................................................................................................... 10

 

9

 

Appendix ............................................................................................................................. 11

 

9.1

 

Technical data and dimensioned drawing ....................................................................... 11

 

9.1.1

 

Pressure switch 901 ................................................................................................................. 12

 

9.1.2

 

Pressure switch 901 Prescal

®

 .................................................................................................. 13

 

9.2

 

Dimensioned drawings and accessories ......................................................................... 14

 

9.2.1

 

Pressure switch 901 ................................................................................................................. 14

 

9.2.2

 

Pressure switch 901 Prescal

®

 .................................................................................................. 15

 

9.3

 

Declaration of Conformity ............................................................................................... 16

 

9.4

 

EC design test certification ............................................................................................. 17

 

9.5

 

Proof of compliance with explosion protection regulations .............................................. 18

 

 

Содержание 901 EX Series

Страница 1: ...k Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 901 EX Rev 10 Page 1 of 18 Ident 0607017 BA 901 R10 2017_englisch_Druckversion doc Operating Instructions...

Страница 2: ...Dr Ernst Thielicke Operating instructions Pressure Switch Model 901 EX Rev 10 Page 2 of 18 1 General instructions 3 1 1 Safety instructions 3 1 1 1 General safety instructions 3 1 1 2 Safety instruct...

Страница 3: ...ings of the symbols that are used are as follows Useful important additional information Dangers and safety instructions Important please read Failure to comply with these instructions can have a detr...

Страница 4: ...d out Dust deposits must be avoided installation location protection cleaning etc in order to prevent dangerous surface temperature increases For the installation procedure it is necessary to take car...

Страница 5: ...ve gasses and dust natural gas bio gas solvents etc Liquid Flammable liquids petrol solvent etc Use in zones in potentially explosive areas Pressure switches are used to monitor the pressure differenc...

Страница 6: ...with the specified zones With intrinsically safe systems i the associated operating materials barrier must al ways be installed outside the potentially explosive area The labelling of the product must...

Страница 7: ...ory corresponds with the specified zones No potentially explosive atmosphere is present A release for work must have been issued by the operator Adherence to the applicable regulations and documentati...

Страница 8: ...being connected are not live otherwise there is a risk of igniting a potentially explosive atmosphere Attach the shield Attach shield at one end in non potentially explosive area Attach braiding of sh...

Страница 9: ...ions and servicing are carried out These include the following For cleaning the devices it is necessary to take care that no electrostatic charging will be done no high volume flow cleaning only with...

Страница 10: ...cturer The following must be observed in potentially explosive areas No potentially explosive atmosphere is present A release for work must have been issued by the operator The applicable regulations...

Страница 11: ...r 100 mA 24 VDC for Dust 2D 30V 60mA 0 6W Electrical connection Arrangement of contacts for 901 1 901 30 901 41 901 51 EX only for 901 2 EX for 901 6 901 8 901 9 EX only for 901 7 EX Certifications CE...

Страница 12: ...e Tolerance band in of trip pressure Maximum positive working pressure standard extended Maximum negative working pressure standard extended 901 1 EX 5 mbar 200 mbar 2 5 mbar 50 mbar 10 0 5 4 bar 1 ba...

Страница 13: ...standard extended Maximum negative working pressure standard extended 901 61 EX 5 20 mbar 10 3 mbar 0 5 4 bar 1 bar 901 62 EX 10 50 mbar 10 5 mbar 0 5 4 bar 1 bar 901 63 EX 25 100 mbar 10 10 mbar 0 5...

Страница 14: ...d accessories Beck GmbH Druckkontrolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 901 EX Rev 10 Page 14 of 18 9 2 Dimensioned drawings and acces...

Страница 15: ...Appendix Beck GmbH Druckkontrolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 901 EX Rev 10 Page 15 of 18 9 2 2 Pressure switch 901 Prescal...

Страница 16: ...Declaration of Conformity Beck GmbH Druckkontrolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 901 EX Rev 10 Page 16 of 18 9 3 Declaration of Co...

Страница 17: ...rolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 901 EX Rev 10 Page 17 of 18 9 4 EC design test certification Note More documentation for EC des...

Страница 18: ...ction class Zone 2 22 Gc Dc Zone 2 22 1 21 Gb Db Zone 1 2 21 22 Ex ia IIB Ex ia IIIB 0 20 Ga Da Zone 0 1 2 20 21 22 Ex ia IIC CHARACTERICTICS Intrinsically safe operating materials Associated operatin...

Отзывы: