Part No. 6-780748-00 Rev. C00

to seal interface between pedestal unit and floor

surface.

7. Remove protective film (when appropriate) and wipe

exterior surface clean. Scratches and marks resulting

from normal handling can be removed by carefully

rubbing surface (following grain pattern) with a 3M

Scotch-Brite-type of material.

Electrical Receptacle Installation

Make appropriate wiring connections to each

receptacle (receptacles may be located at any opening on

pedestal unit). Fasten receptacles to pedestal unit using

mounting screws provided. Attach trim coverplates, as

required, using mounting screws (Figure 5).

Lid Installation

1. Remove fasteners from inside of lid.

2. Place lid onto pedestal unit and install fasteners

securely (Figure 6).

Protection During Remainder of

Construction and Cleaning

1. Cover unit with clean, soft cloth or other appropriate

materials to protect unit from dust and damage during

completion of room construction.

2. Outlets may be wiped down with alcohol or mild

detergent solution to clean.

3. Stainless steel surface may be cleaned with any

suitable cleaner. Scratches and marks may be

Route gas and electrical service(s) through proper

openings in floor surface.

3. Position pedestal unit and attach four corner

fasteners. Assembly should be mounted securely to

floor surface (Figure 4).

4. Attach medical gas piping to gas service extension(s)

on outlet block(s) mounted on inside of pedestal

(Figure 4). Follow procedures explained in National

Fire Protection Association, NFPA 99.

5. Route electrical wiring leads to appropriate mounting

box locations. Follow procedures explained in local

codes.

6. Use clear silicone sealer (to be supplied by installer)

Figure 3

Electrical

Service

Conduit

Medical Gas

Service Piping

Figure 4

NOTE:

It is recommended installer use 5/16” diameter

stainless steel fasteners with anchors.

NOTE:

Electrical rough-in boxes may be temporarily

removed to improve access to gas service extensions during

brazing.

WARNING:

Each gas service extension is identified by

color-coded gas service labeling. It is the responsibility of the

installer to be certain that all outlets are correctly connected

and system integrity is verified by system certification testing.

Figure 5

Figure 6

Two or Three Lid

Fasteners per Side

NOTE: Pedestal shown with

Puritan Bennett Quick-

Connect outlets installed.