background image

Rainbow 36 V NBC-Filtration & Ventilation System

Rainbow 36 V 

 Ventilation and Air Filtration System 

for a Residential Safe Room 

·

 

www.beind.co.il

7  

|

 

Step 5

Step 4

Remove the cover of the air inlet valve

To remove the cover, push the safety button downward (if 
there is one) 

(1)

, and rotate the cover counterclockwise 

(2)

.

Release the strap of the connecting hose (1)

and attach the loose end to the filter on the wall 

(2)

.

Make sure that the inlet cable is attached to 
the electric blower and attach the other end to 
the wall outlet (1). Press the operating switch 
on the blower (2).

(Wait a few seconds for the blower to start working.)

Attention!

 The indicator vane on the air outlet valve will start 

to spin after a few seconds--this indicates that the room is in the 
required state of overpressure. In the event that the indicator vane 
doesn’t rotate, this is a warning that the room is not properly sealed.

Attach the filter to the air inlet valve

Hold the filter by the handles and, with the blue arrow 
pointing upward, insert the pins into the holes on 
the flange that is on the wall 

(1)

. Turn it clockwise 

until the green arrow is pointing vertically and the 
filter can’t be turned any more 

(2)

.

Step 6

Step 7

Step 8

1

2

2

3

1

2

1

1

2

Содержание Rainbow 36 V

Страница 1: ...ystems Approved by the Civil Defense Command and the Standards Institution of Israel In accordance with Israel Standard 4570 Beth El Industries Rainbow 36 V User s Manual Ventilation Air Filtration Sy...

Страница 2: ...ww beind co il 2 Table of Contents Page Safety Instructions 3 System Parts List 4 System s Principle of Operation 6 Using the System 8 Routine Storage 10 Troubleshooting 11 Contact Information back co...

Страница 3: ...o not use the system for any purpose other than for ventilation and filtration of a residential safety room and protection from biological and chemical warfare substances while staying in the safety r...

Страница 4: ...il 4 System Parts List System cover Air inlet valve Connecting hose Electric blower Manual blower NBC filter Installed on the air inlet valve Indicator vane Installed on the overpressure blast valve B...

Страница 5: ...enings When the room is in a state of overpressure the indicator vane 2 spins around In this state it is possible to remain in the room without the personal NBC masks on condition that the room is not...

Страница 6: ...plumbing air conditioning water and sewage in the event that they are available in the residential safety room are sealed adequately Step 1 Remove the system cover Grasp the two handles on the sides...

Страница 7: ...wall outlet 1 Press the operating switch on the blower 2 Wait a few seconds for the blower to start working Attention The indicator vane on the air outlet valve will start to spin after a few seconds...

Страница 8: ...e positions First Position Attaching the manual blower directly to the filter In a residential safety room in which there is an air inlet valve located at a height below 1 6 meters Remove the manual b...

Страница 9: ...he flexible hose 2 to it Attach the bracket to the adapter on the wall by means of sliding the bottom of the tabs into the appropriate slots as much as possible 3 Be sure that the other end of the con...

Страница 10: ...emergency situation the company should be summoned for a service check and maintenance of the filter If there was no NBC attack but the filter was attached to the wall nonetheless it is possible to de...

Страница 11: ...e opening of the filter and blower The filter doesn t fit into its location in the inlet valve A Make sure that you are holding the filter in the proper direction with the blue arrow on the label of t...

Страница 12: ...Telephone 04 629 9988 E mail Rainbow beind co il Beth El Zikhron Yaaqov Industries Ltd 1 Avshalom Road P O Box 166 ZikhronYaaqov 3095101 Israel Tel 972 4 629 9999 israel beind com www beind co il rain...

Отзывы: