
7
6
WALL SYSTEM
3:
2:
Align the left side of the Bracket
Template with the wall mark. Level the
Template with the string, and insert
Wall Bracket (B) into its designated
groove. Mark the wall at bracket holes
to locate fastener locations.
B
4:
Attach first Bracket to the wall using
the appropriate attachment method
illustrated below.
Wooden Beam: (B) Bracket
(D) Screws
Concrete/Brick: (X) Plastic Concrete Anchors
(B) Bracket
(D) Screws
A
1
/
4
" masonry drill bit and
Power Drill is required for
pilot holes.
C
X
B
B
B
D
D
D
Sheet Rock:
(C) Drywall Anchors
(B) Bracket
(D) Screws
H
H
H
B