BDI Icon 9424 Скачать руководство пользователя страница 3

Step  3 

Installing the Shelf 

brackets.

Shelf brackets can be adjusted to 
offer three different shelf positions.

Step  4 

Installing Back panel.

Back panel is to be installed with 

small holes facing backward.

Wire management straps.

Velcro straps are supplied to control 

cables.  They can be screwed into 
the steel at top and bottom of the 

arm or into the small holes on the 
back panel.

K

L

H

x 4

E

H

x 2  
brackets

E

E

Отзывы: