background image

S5864 Hardware Installation Manual 

 

 

- 6 

 

 

Pull out the AC power socket and close the direct-current power before operating 
on the machine box or working beside the power source. 

 

When the power is on, do not touch the power. 

 

Correctly connect the device and the power socket. 

 

Only professionals are allowed to operate and maintain the device. 

 

Read the installation guide carefully before the system is powered on. 

Note:

 

1) 

Check  potential  dangers,  such  as  the  humid  floor,  ungrounded  extensible  power 
line and tatty power line. 

2) 

Install  the  emergent  on-off  at  the  working  room  for  turning  off  the  power  when 
trouble happens. 

3) 

Turn off the power on-off of the switch and plug off the power line before installing 
or uninstalling the machine box or working beside the power. 

4) 

Do not work alone if potential dangers exist. 

5) 

Cut off the power before checkout. 

6) 

If trouble happens, take the following measures: A. Cut off the system's power. 

B.  Alarm. 

C.  Take  proper  measures  to  help  persons  who  are  hit  by  the  disaster.  Artificial 

respiration is needed if necessary. 

D.  Seek for medical help, or judge the loss and seek for available help. 

2.2.4 Electrostatic Discharge Damage Prevention 

Electrostatic discharge may damage devices and circuits. Improper treatment may cause 

the switch to malfunction completely or discontinuously. 

Move  or  locate  the  devices  according  to  the  measures  of  electrostatic  discharge 

prevention, ensuring the machine box connects the ground. Another measure is to wear 
the static-proof hand ring. If there is no hand ring, use the metal clip with the metal cable 
to clip the unpainted metal part of the machine box. In this case, the static is discharged 
to the ground through the metal cable of the clip. You can also discharge the static to the 
ground through your body. 

2.3 Requirements for Common Locations 

This part describes the requirements for the installation locations. 

Содержание S5864

Страница 1: ...S5864 Hardware Installation Manual...

Страница 2: ...2 4 Electrostatic Discharge Damage Prevention 7 2 3 Requirements for Common Locations 7 2 3 1 Environment 7 2 3 2 Location Configuration Prevention 7 2 3 3 Cabinet Configuration 7 2 3 4 Power Require...

Страница 3: ...1 USB Interface 15 3 4 Checking After Installation 15 Chapter 4 Maintaining Switch 17 4 1 Opening the Machine Box 17 4 2 Closing Machine Box 18 Chapter 5 Hardware Fault Analysis 19 5 1 Fault Separatio...

Страница 4: ...5 2 Indicator Description 19 II...

Страница 5: ...e LINK ACT indicator 40GE optical port QSFP interface LINK ACT indicator Console port RJ45 interface a rate of 9600bps Ethernet management port RJ45 interface USB interface USB interface S5864 has 5 h...

Страница 6: ...swap fan modules 1 2 S5864 Systematic Characteristic Parameters Protocol standard Supported standard IEEE 802 1d Spanning Tree Protocol IEEE 802 1s multiple spanning trees IEEE 802 1p Class of Service...

Страница 7: ...gigabit management interface Dimensions mm W D H 442 5 404 44 Operating temperature humidity 0 40 10 85 non condensing Storagetemperature humidity 40 80 5 95 non condensing Power characteristics Input...

Страница 8: ...ther electronic products the semiconductor chip easily gets damaged if you power on or off abruptly and frequently To restart up the switch of S5864 you have to open the power on off after the power i...

Страница 9: ...the sleeve avoiding stumbling the machine box Put on the protective glasses if the environment may cause damage to your eyes Avoid incorrect operations that may cause damage to human or devices 2 2 2...

Страница 10: ...eckout 6 If trouble happens take the following measures A Cut off the system s power B Alarm C Take proper measures to help persons who are hit by the disaster Artificial respiration is needed if nece...

Страница 11: ...is sealed because the opened machine box will reverse the cool air flow 2 3 3 Cabinet Configuration The following content assists you to make a proper cabinet configuration Each device on the cabinet...

Страница 12: ...Tools and Device The tools and devices to install the S5864 switch are not provided by the S5864 switch You yourself need to prepare them The following are the tools and devices needed for the typica...

Страница 13: ...hing 4 5 kg or over 4 5 kg on the top of the switch 3 2 2 Installing the Machine Box on the Cabinet The machine box of the switch is fixed on the cabinet through the brackets When you fix the brackets...

Страница 14: ...emulation software such as super Windows terminal The cable is provided according to the host The communication parameters of the terminal serial port can be set to a rate of 9600bps eight data bits...

Страница 15: ...cable is DB9 The RJ45 plug is put into the socket of the console port on the S5864 switch The inner line connection in the cable is shown in figure 3 1 The console cable is numbered as RLC0301 Figure...

Страница 16: ...tors are used to indicate the LINK ACT state The ports can connect other Ethernet terminal devices through the UTP port and the direct through or cross network cable The numbering order of the pins in...

Страница 17: ...normal phase of data 2 TP2 5 Sending receiving the paraphase of the data 2 TP2 6 Sending receiving the paraphase of the data 1 TP1 7 Sending receiving the normal phase of data 3 TP3 8 Sending receivin...

Страница 18: ...ng the 40GE QSF port and other Ethernet terminals 2 Set the ports to 4 10GE ports You can connect the QSFP optical module to the optical port and then you can connect other Ethernet terminal devices w...

Страница 19: ...ution The switch shown in figure 3 10 does not represent the material S5864 1 3 1 USB Interface S5864 provides with 1 USB2 0 interface Figure 3 11 Connecting USB2 0 interface 3 4 Checking After Instal...

Страница 20: ...strong If the switch is installed on the desk check whether there is enough space for the switch to discharge its heat and whether the desk is stable Check whetherthe connected power meets the power r...

Страница 21: ...ution When the power cable still connects the power source do not touch it When you open the cover the switch you may use the following tools Crossed screwdriver Static armguard Perform the following...

Страница 22: ...e switch on the cabinet or the desk 5 Reconnect all cables of the switch Chapter 5 Hardware Fault Analysis The part describes how to remove the fault from the switch 5 1 Fault Separation The key for r...

Страница 23: ...baud rate of 9600 bps eight data bits no sum check bit one stop bit and no traffic control 5 2 Indicator Description The LED indicator shows that the switch is running The following table shows the in...

Страница 24: ...10GE ports The 4 port indicators are on in turn The interval between two indicators is 5 seconds The indicators combing with BREAKOUT indicators show the state of 10GE ports 40GE BREAKOUT 1 4 The 40G...

Страница 25: ...ce names and company names which are written in this manual but do not belong to the company belong to their owners respectively Disclaimer of warranty provides no evident or hinted guarantee towards...

Отзывы: