background image

                                                                                                                              S3756P Hardware Installation Manual 

- 6 - 

 

Read the installation guide carefully before you operate the system.   

 

Only professionals are allowed to install or replace the switch. 

 

Pull out the AC power socket and close the direct-current power before operating on 
the machine box or working beside the power source.   

 

The  final  configuration  of  products  must  comply  with  relative  national  laws  and 
regulations. 

2.2.3 Safety Principles for Live Working 

When you work under electricity, following the following principles: 

 

Put  off  ornaments,  such  as  ring,  necklace,  watch  and  bracelet,  before  you  operate 
under  live  working. When  metal  articles  connect  the  power  to  the  ground,          short 
circuit happens and components may be damaged.   

 

Pull out the AC power socket and close the direct-current power before operating on 
the machine box or working beside the power source.   

 

When the power is on, do not touch the power.   

 

Correctly connect the device and the power socket.   

 

Only professionals are allowed to operate and maintain the device.   

 

Read the installation guide carefully before the system is powered on. 

Note

:   

1)   

Check potential dangers, such as the humid floor, ungrounded  extensible power line 
and tatty power line.   

2)   

Install the emergent on-off at the working room for turning off the power when trouble 
happens.   

3)   

Turn off the power on-off of the switch and plug off the power line before installing or 
uninstalling the machine box or working beside the power.   

4)   

Do not work alone if potential dangers exist.   

5)   

Cut off the power before checkout.   

6)   

If trouble happens, take the following measures: 

A.  Cut off the system's power. 

B.  Alarm. 

C.  Take  proper  measures  to  help  persons  who  are  hit  by  the  disaster.  Artificial 

respiration is needed if necessary. 

D.  Seek for medical help, or judge the loss and seek for available help. 

Содержание S3756P

Страница 1: ...S3756P Hardware Installation Manual...

Страница 2: ...ctrostatic Discharge Damage Prevention 7 2 3 Requirements for Common Locations 7 2 3 1 Environment 7 2 3 2 Location Configuration Prevention 7 2 3 3 Cabinet Configuration 7 2 3 4 Power Requirements 8...

Страница 3: ...on 15 Chapter 4 Maintaining Switch 16 4 1 Opening the Machine Box 16 4 2 Closing Machine Box 17 Chapter 5 Hardware Fault Analysis 18 5 1 Fault Separation 18 5 1 1 Faults Relative with Power and Coolin...

Страница 4: ...icators 10G Ethernet port SFP interface with LINK ACT indicators Console port A rate of 9600bps mini USB interface Besides S3756P has a grounding column two power sockets and two power on off at its b...

Страница 5: ...ounding column must be fine 3 POWER AC power on off AC100 240V 4 POWER AC power on off AC100 240V Note S3756P supports dual power supply 1 2 S3756P Systematic Characteristic Parameters Protocol standa...

Страница 6: ...10 100 1000BASE T ports 8 10GE Ethernet SFP ports 1 Console port Dimensions mm W D H 442 50 315 44 Operating temperature humidity 0 40 10 85 non condensing Storage temperature humidity 40 80 5 95 non...

Страница 7: ...S3756P Hardware Installation Manual 4 1 3 ROHS Description...

Страница 8: ...et Note 1 When you plug or dial the power line keep the power line horizontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulations or s...

Страница 9: ...n the machine box or working beside the power source When the power is on do not touch the power Correctly connect the device and the power socket Only professionals are allowed to operate and maintai...

Страница 10: ...desk or the cabinet The location of the machine box cabinet planning and indoor cabling are very important for normal system s function Short distance between devices bad ventilation and untouchable...

Страница 11: ...fferent location tests 2 3 4 Power Requirements Power Requirements Make sure that the power supply has nice grounding and the power at the input side of the switch is reliable The voltage control can...

Страница 12: ...S3756P Hardware Installation Manual 9 Ethernet cable Other Ethernet terminal devices Control terminal...

Страница 13: ...e the devices 3 1 Installation Flow of S3756P 3 2 Installing the Machine Box of the Switch The installation of the machine box has two modes Installing the machine box on the desk Installing the machi...

Страница 14: ...See Figure 3 2 Figure 3 2 Installing the switch on the cabinet 3 3 Connecting the Port 3 3 1 Connecting the Console Port The switch of S3756P has a console port The rate of the console port is a value...

Страница 15: ...control Therefore you must set the option data traffic control to none when you configure the switch with the super terminal Otherwise the single pass problem will arise on the super terminal The cabl...

Страница 16: ...FP port and then you can connect other Ethernet terminal devices through the optical cable Figure 3 5 Connecting the 10G SFP port and other Ethernet terminals Note The machine in the figure does not r...

Страница 17: ...ing figure Figure 3 6 RJ 45 connector of the console port Because the 48 10 100 1000Base T ports of S3756P support the MDI MDIX self identification of the cable S3756P can adopt five types of direct t...

Страница 18: ...se of the data 3 TP3 3 4 Checking after Installation Before electrically starting up the switch perform the following checkups after the switch is installed If the switch is installed on the cabinet c...

Страница 19: ...o open the cover of the switch required tools and operation methods Caution When the power cable still connects the power supply do not touch it When you open the cover the switch you may use the foll...

Страница 20: ...ne Box The section mainly describes how to put the cover and close the machine box Do as follows 1 Put them well according to their locations and joint them together along their sides See the followin...

Страница 21: ...help remove the fault When the power on off is at the ON location check whether the fan works normally If the fan does not work well check the fan The working temperature of the switch is from 0 to 40...

Страница 22: ...system is being started up When the indicator flickers the system works well 3 POE POE indicator If the indicator is always on the port is powered on If the indicator is off the port is not powered on...

Страница 23: ...his manual In no event except for the company s breach of law shall the company be liable for incidental consequential indirect or special damages of any kind or for loss of profits or revenue or loss...

Отзывы: