S2518PB Hardware Installation Manual
- 13 -
3.4 Checkup after Installation
Before feeding power to start the switch, perform the following checkups after the switch is
installed:
If the switch is installed on the DIN rail, check whether the installation is strong.
If the switch is installed on the desk, check whether there is enough space for the switch to
discharge its heat and whether the desk is stable.
Check whether the connected power supply meets the power requirements of
the switch.
Check whether the grounding line of S2518PB is correctly connected.
Check whether S2518PB is correctly connected to other terminal devices.