S2510-B Hardware Installation Manual
- 17 -
normally.
2
SYS
System indicator
If the indicator flickers, the system works
normally.
3
Link/Act
Link/Act indicators
If the orange indicator is on, it means 10/100M.
If the green indicator is on, it means 1000M.
If the indicator is off, there is no signal
transmission.
3
LED Link/ACT
LED indicator
If the corresponding port is linked, the LED
indicator is on.
If the corresponding port is transmitting data, the
LED indicator flickers.
Figure 5-1 Definition of S2510-B Switch Indicators
Copyright Claims
Without the written approval of
the company
, any person or group cannot transcribe, copy or
change partial or all contents of this manual, and must not broadcast it in any manner.
Trademark claims
Trademarks, product names, service names and company names, which are written in this manual
but do not belong to
the company
, belong to their owners respectively.
Disclaimer of warranty
provides no evident or hinted guarantee towards the contents of this manual. In no event, except
for
the company
’s breach of law, shall
the company
be liable for incidental, consequential, indirect
or special damages of any kind or for loss of profits or revenue or loss of business arising out of or
relating to this manual.
Note: Customer shall not be notified of this manual’s content amendments.
Содержание S2510-B
Страница 1: ...S2510 B Hardware Installation Manual...