21 October 2011
Ford 6.7L 2011-2012 Positive Air Shutoff
7
BD ENGINE BRAKE, INC.
Plant Address: A10-33733 King Rd, Abbotsford, BC, Canada V2S 7M9
US Shipping Address: 88-446 Harrison St, Sumas, WA 98295 US Mailing Address: PO Box 231, Sumas, WA 98295
Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com
When both pipes are cut they should look like this.
WATER TO AIR PIPE TURBO PIPE
5. Remove backing from drill
Jig sticker and wrap around
pipe. The edge of the sticker
should line up with the edge
of the pipe.
For the 3” pipe the sticker
should wrap perfectly around
the pipe, the start of the sticker
should meet the end of the
sticker.
NOTE
: Refer to the Bead Ring
and Drill Jig Installation section
on page 29 in this manual if you
require more information.
Sticker edge and pipe
edge inline