SSS3416TCS
Owner’s Manual
11
Step 12 (Install the heating plate, cooking grid and
warming rack)
a) Place the heating plates (J) upon each
burners.( as shown in the diagram)
b) Put the left cooking grid (I) and right cooking grid
(H) upon the heating plates.
c) Put the left warming rack (F) and right warming
rack (G) on the side walls of firebox.
d) Close the top lid.
Step 14 (Install the tank clip)
a) Inset the tank clip (P) into the holes on the tank
holder.
S
tep 15 (Install the gas tank)
a) Place the gas tank on the gas holder, and then clip it using the
tank clip.
b) Connect the tank with regulator by screwing regulator collar
onto the tank valve.
c) Conduct the leaking test on page 13.
Step 13 (Install the grease cup and grease cup support)
a) Hook the grease cup support (E) into the grooves
beneath the insulation plate.
b) Put the grease cup (D) onto the grease cup support.