5.4
1.
Install the Bazzaz ground lug to the
negative side of the battery.
5>CONNECT
(CONT.)
5.5
1.
Locate and disconnect the factory coil
connectors from each coil and plug
the Bazzaz coil connectors (right to
left) in-line with the factory coil and coil
connector. The Bazzaz coil connectors
with the blue and brown wires will go to
coil #2 (right coil).
BAZZAZ
FACTORY
6>QUICKSHIFT
1.
Measure and note your shift pedal
height, so that you may reposition the
shift pedal once complete.
2.
Remove the factory shift rod and both
heim joints.
3.
Install the Bazzaz heim joints and shift
switch using one of the supplied allen
stud bolts and tighten.
4.
Install the Bazzaz shift rod. (The shift
rod may need to be cut to obtain your
original shift pedal height.
5.
Ensure to retighten all lock nuts on the
shift linkage.
AFTERMARKET REAR SETS ARE REQUIRED