5>CONNECT/ROUTE
Z-FI
INJ #2
RIGHT
TPS
GROUND
POWER
CKPS
1.
Connect the main connector of the Bazzaz fuel
harness to the control unit.
2.
Route the portion of the fuel harness with the
injector #2 and CKPS connectors to the right
side of the bike.
3.
Route the portion with the +12V switched
power connector towards the rear, next to the
battery.
4.
The remaining portion can hang on the left side
for now.
INJ #1
LEFT
Содержание F1084
Страница 11: ......
Страница 12: ...R THE SMARTEST PERFORMANCE TUNING TECHNOLOGY F1084...