63 9810.0293 - Rev.00 - 08/09/2008
33
OPERATING AND MAINTENANCE INSTRUCTIONS
•
Recommended that the annual equipment service should be made by
Baymak official services.
•
Loading coal of the boiler should be made from middle door. The ash
cleaning door only should be used for skewering to coal and getting out of
the try. If lover cover is open while the middle cover opened for coal loading
process, unconditionally lover cover must be closed. If you want the ash
cleaning door is open after loading process finishes, it may open. But, while
the ash cleaning door open, ash or particles of charcoals which be occurred
as a result of burning process, you must be sure if there isn’t any flammable
or burning things at the front side of the boiler.
•
If there is any restricting at the chimney (clack), it should be certainly stayed
open position at first burning, the chimney should be restricted using the
clack after getting some enough flame. Otherwise, upper side of the coal
will be black and won’t be burnt as a result of bad combustion
•
Cleaning of the boiler make your boiler efficiently operate.
•
Clearing of the boiler is very easy to be done using the equipment supplied
with the boiler. Clearing process of the boiler depends on fuel quality and
ash rate of it. But, the cleaning of the boiler at least should be one time in a
week that should be made efficiently operates it.
•
Necessary air for combustion is given into the boiler with the fan. An
adjustable thermostat command to the fan. If the fan is out of order, please
make an application to the Baymak authorized service. Circulation pump and
boiler should be serviced end of the every winter season
•
There is a lot of coal type that loading of the boiler, so; next loading time
could be different. But generally the next loading period (after first loading)
is 4-4.5 hour for coal type flues, 2-2,5 hour for wood type fuel. Amount of
the fuel ought to be changed of the calorific value of the fuels.
•
To calculating amount of the coal for 1 hour, boiler input power ought to be
divided to calorific value of the coal and efficiency of the boiler.
Содержание Linyitomat Plus
Страница 3: ...63 9810 0293 Rev 00 08 09 2008 3 LĐNYĐTOMAT PLUS 20 40 60 80 ...
Страница 4: ...63 9810 0293 Rev 00 08 09 2008 4 ...
Страница 5: ...63 9810 0293 Rev 00 08 09 2008 5 Top view Front view Right side view Left side view ...
Страница 29: ...63 9810 0293 Rev 00 08 09 2008 29 AUTOMATIC Electronic Control Board Manuel Automatic Control ...
Страница 30: ...63 9810 0293 Rev 00 08 09 2008 30 Electricity connection circuit scheme ...
Страница 31: ...63 9810 0293 Rev 00 08 09 2008 31 ...
Страница 32: ...63 9810 0293 Rev 00 08 09 2008 32 Boiler installation scheme with hot water tank ...