background image

63   9810.0293 - Rev.00 - 08/09/2008 

 

22 

LINYITOMAT PLUS BOILER BURNING  INSTRUCTION 

 

  Burning  method  changes  according  to  size  of  coal.  Coal  quality  and  the 

characteristics of the burning,  affect to the burning  method and efficiency of 
the boiler 

 

Normal  sized  coals  (Orange  size), 

For  first  burning,  fill  some  wood  and 

wood  part  and  ignite  from  lover  side.  This  time  the  fan  should  be  closed 
position  and  the  ash  cleaning  door  should  be  fully  open,  the  other  doors 
should be closed. After igniting, the ash cleaning door should be closed and 
loading  door  opened,  1/3  capacity  of  coal  per  excreted  in  the  boiler  (The 
average  5-20kg).  After  coal  loading  process,  the  fan  can  be  on  position.  In 
this position even the fan off, burning can be started but it’s depending to the 
coal quality. 

  You can choose the burning methods at above, according to the coal quality 

and statement of combustion. 

  Loaded  1/3  capacity  coal  start  to  burning  and  begin  to  charcoals,  the  ash 

cleaning door to be opened and skewered and than to be made last loading. 

  For  the  last  loading,  completely  fill  the  boiler. During  the  burning,  open  the 

the ash cleaning door and skewer to the coal every 2-3 hour.  Also open the 
coal loading door  and  reverse sunburned coal parts  using  a rabble. During 
the coal loading process to be sure if ON/OFF switch at OFF position. If it is 
not, turn it OFF  

  It is important that fan’s electrical connections to be done right, otherwise the 

fan  doesn’t  work  correctly  and  doesn’t  give  enough  air  into  combustion 
chamber. 

  Load the boiler  with coal before the coal completely  burn. (When the coals 

become  completely  charcoals)    Operating  the  boiler  in  this  way  is  more 
economic and more efficient.  

  In  the  mornings,  the  ash  cleaning  door  to  be  opened  and  skewered.  After 

starting of the burning can be loaded coal. Before this process, the fan may 
be made Switch On. 

  If  coal  loading  was  not  enough  in  the  previous  evening  or  in  the  day  coal 

level  gets low,  load  some  wood  and  after  getting  enough  burning  and  load 
the enough coal. Otherwise if the coal loaded on the some sunburned coal, 
it causes to be flame turned off. 

  The boiler should be cleaned at list once a week. Burning efficiency will get 

higher when used cleaned boiler.   

 
 

 

Don’t use cokes. 

 

 
 

 

Powder  coal,  and  a  very  small  with  granular  coal, 

For  the  first  burning,  

fill  to  much  wood  and    wood    part  and  ignite  them.  (the  ash  cleaning  door 
should be open).  

  When the flame is grove enough, load 5-10 kg coal on the woods. Until coal 

and wood turn into charcoals, you should wait.  

Содержание Linyitomat Plus

Страница 1: ...63 9810 0293 Rev 00 08 09 2008 BAYMAK LĐNYĐTOMAT PLUS DOMESTIC SOLID FUEL BOILERS INSTRUCTION AND OPERATING MANUAL ...

Страница 2: ...refully before you use the boiler You will have the Service Center Address Book which include the information dealing with the authorised service center with this book The boiler s initial operating must be done by Baymak authorised service otherwise the boiler will be out of warranty BAYMAK MAKĐNE SANAYĐ VE TĐCARET A Ş Orhanlı Beldesi Orta Mahalle Akdeniz Caddesi No 7 Tuzla ĐSTANBUL Tel 0216 304 ...

Страница 3: ...63 9810 0293 Rev 00 08 09 2008 3 LĐNYĐTOMAT PLUS 20 40 60 80 ...

Страница 4: ...63 9810 0293 Rev 00 08 09 2008 4 ...

Страница 5: ...63 9810 0293 Rev 00 08 09 2008 5 Top view Front view Right side view Left side view ...

Страница 6: ...ler water outlet pipe 11 Expansion tank outlet pipe 12 Boiler water inlet pipe 13 Expansion tank outlet pipe 14 Boiler filling and drainage pipe 15 Fluegas box 16 Fluegas box cleaning door 17 Boiler top casing 18 Boiler right side casing 19 Boiler left side casing 20 Boiler back casing 21 Boiler front bottom casing 22 Boiler front middle casing 23 Door opening closing handle 24 Ash shaking dischar...

Страница 7: ...vice Warning Info You can find special information and advices here Reference to additional information in other documents General Safety Cautions All local regulations including those referring to national and European standards need to be complied with when installing the appliance Don t use the appliance as an incinerator or any other different way from which it has been conceived Don t use uns...

Страница 8: ...r member of service These seals prove that bolts which is necessary for perfect and safe operation has not been changed If seals get damage boiler will be out of warranty Alteration structural cursory modifications and all similar works are forbidden These kind of modifications may be dangerous for people and cause damages on boiler In case of neglagence of these subjects boiler will be out of war...

Страница 9: ...installed on floors with an adequate load bearing capacity If an existing construction doesn t meet this prerequisite suitable measures e g load distributing plate shall be taken to achieve it The installation of the appliance need to provide access for cleaning the appliance the flue gas connector and the chimney flue Caution Subjects refering considerations during mountings related with operatio...

Страница 10: ...nting direction towards chimney and connections must have full imperviousness The chimney must be designed considering technical specifications determined in DIN 4705 and built according to DIN 18160 The boiler should be placed onto the concrete base The size of the concrete base is shown on the table After placing the boiler on to base it should be balanced from the ground surface B Wide Concrete...

Страница 11: ...idden to use an ordinary chimney Mount the flue gas connection pipe on to the chimney with ascending slope The flue gas pipe must have min 1 one m height and if necessary elbow pipe should be used after this height It must have min 10 towards the chimney and its length never passes the 0 25 x height of the chimney siphon Linyitomat Plus Boiler Chimney Connection Example Electricity and fan connect...

Страница 12: ... air may be exist on installation except boiler Carrying and transportation must be done together with original packaging material of device considering the marking on the boiler Please protect the boiler against factors that can damage to packaging material and device Caution Check the slants of boiler installation connetions with a water gauge After slants have been done there must not been any ...

Страница 13: ...l installation pipe not plastic The usage of the plastik installation pipe on expansion tanks is very dangerous and in this case the boiler will be out of warranty To fill and drain water to the boiler you must mount a valve You should isolate all the installation pipes to prevent heat loss Make the boiler electricity connection to the grounding plug In case of power cut never load coal to the boi...

Страница 14: ...ystem water To prevent the damages occured as a result of corrosion in installation quality of heating water must be as good as drinking water Unsuitable waters containing chemical additive substances or causing to corrosion must not be used Filling water for boiler and installation should not contain residues contaminates and unwanted solid materials These unwanted materials are very dangerous fo...

Страница 15: ...tomatic and manuel mode At manual mode the control of fan is maked by adjusting thermostat on control panel The fan works until the boiler water temperature reaches the selected temperature by adjusting thermostat When it reaches to adjusted temperature the fan stops automatically and when the boiler water temperature decreases 5 C the fan starts working again When the boiler water temperature rea...

Страница 16: ...work fan you can switch the off button on the control panel In this case the fan doesn t work You can have a good combustion without fan It depends on the quality and thermal efficiency of coal The fixable and adjustable flue gas flap system was designed to control combustion Pulling the arm to yourself by the help of spring and pin you will control the combustion When the chimney draught is too h...

Страница 17: ...boiler by loosening the nuts This demounting operation must be done when the boiler doesn t work The flue gas box cleaning cover is opened by loosing the wingnuts You can easily clean the flue dust in the flue gas box Demounted flue gas box The Linyitomat plus boiler doors have slotted hinges and they are easily adjustable to have good sealing by loosening tighteening the socket head screws ...

Страница 18: ...ng direction of the door with the changing process right and left hinges by loosening socket head screws The opening direction is adjusted clockwise direction at the factory You can shake the ashes on the grids by pulling and pushing ash shaking arm little by little on the right side of the boiler By pulling the arm to yourself you can discharge the ashes into the ash tray or combustion chamber ...

Страница 19: ...e coal into the fire room with the ash tray which be put into bottom of the combustion chamber The fan assembly you must be sure that no air leakage by fixing the gasket between fan you will find the fan in the combustion chamber when you unpacked the boiler and the door with screws The electricity connection must be comply with the electrical scheme Coal loading Ash discharging ...

Страница 20: ...rol panel assembly All the sensors on the control panel should be mounted correctly in the sensor beehives that are located backside of the boiler 1 The fan connection bolts 2 The fan box gasket 1 Cable pass plate 2 Cable gland fan power supply connection cable The door is opening from the left to right on picture So the fan connection is maked from the right cable pass plate In case of the door o...

Страница 21: ...rtant and necessary for operating safely of the boiler To be sure if the sensors mounted to correct place and fixed properly Control Panel 1 Boiler Thermostat Sensor 2 Boiler Thermometer Sensor 3 Boiler Safety Thermostat Sensor 4 Fasten sensor clip ...

Страница 22: ...ry 2 3 hour Also open the coal loading door and reverse sunburned coal parts using a rabble During the coal loading process to be sure if ON OFF switch at OFF position If it is not turn it OFF It is important that fan s electrical connections to be done right otherwise the fan doesn t work correctly and doesn t give enough air into combustion chamber Load the boiler with coal before the coal compl...

Страница 23: ...y charcoal Boiler back side must not be closed Back side air flow definitely should be made Before leaving the boiler asleep at the nights the charcoals should be spread in the boiler and covered up on the charcoals completely All the doors should be closed To start to burn at the mornings the coal in the boiler should be skewered at the lover side for reveal of the charcoals If the charcoals are ...

Страница 24: ...rature low than at the table an auxiliary pump have to be used In case circulation pump doesn t run flame situation should be checked in the boiler Level of coal should be check if the coal level is enough for increasing of the water temperature In that case measure must be taken Fuel loading mouth measurements A mm B mm LĐNYĐTOMAT 20 PLUS 330 203 LĐNYĐTOMAT 40 PLUS 430 210 LĐNYĐTOMAT 60 PLUS 430 ...

Страница 25: ...AT PLUS 60 60 000 A 50 180 XM 100 LT LĐNYĐTOMAT PLUS 80 80 000 A 56 180 XM 110 LT PUMP TECHNICAL DETAILS MODEL STEP REVOLUTIONS d dak POWER W CURENT CAPASITOR Mf Installation connection Electricity connection 1 1440 44 0 2 2 1910 60 0 28 VA 35 130 3 2370 71 0 31 2 1 G 1x230 V 50 Hz 1 1050 51 0 24 2 1460 78 0 35 VA 65 130 3 2100 102 0 45 2 5 1 G 1x230 V 50 Hz 1 2297 168 0 80 2 2651 189 0 92 A 50 18...

Страница 26: ...ure Bar 4 5 4 5 4 5 4 5 Necessary Draught mbar Flue Gas Temperature at nominal heat output ºC 176 5 196 6 170 170 Flue gas mass flow at nominal heat output kg s 0 02641 0 03307 0 04188 0 08433 Flue gas mass flow at minimum heat output kg s Mean content of CO at 10 O2 0 585 0 642 0 734 0 764 Water side resistance mbar Nominal heat output for coal kW 22 5 46 15 69 22 93 11 Heat output range for coal...

Страница 27: ...EL L L1 L2 B B1 B2 H H1 H2 F WEIGHT VA 35 130 130 98 60 104 78 26 124 75 49 1 G 2 65KG VA 65 130 130 98 60 104 78 26 124 75 49 1 G 2 65KG A 50 180 XM 180 90 90 173 34 139 143 52 92 2 G 4 8 A 56 180 XM 180 90 90 173 34 139 143 52 92 2 G 4 8 ...

Страница 28: ...n the water temperature is 40ºC the pump starts working When the water temperature starts to decreasing it stops the pump at 40ºC and stops the fan at 30ºC IMPORTANT In automatic working position minimum one of the pump button or the fan button must be closed 0 to have a good working 2 For working manual operating Switch the manuel 0 Otomatik button to manuel position In this position the fan and ...

Страница 29: ...63 9810 0293 Rev 00 08 09 2008 29 AUTOMATIC Electronic Control Board Manuel Automatic Control ...

Страница 30: ...63 9810 0293 Rev 00 08 09 2008 30 Electricity connection circuit scheme ...

Страница 31: ...63 9810 0293 Rev 00 08 09 2008 31 ...

Страница 32: ...63 9810 0293 Rev 00 08 09 2008 32 Boiler installation scheme with hot water tank ...

Страница 33: ...per side of the coal will be black and won t be burnt as a result of bad combustion Cleaning of the boiler make your boiler efficiently operate Clearing of the boiler is very easy to be done using the equipment supplied with the boiler Clearing process of the boiler depends on fuel quality and ash rate of it But the cleaning of the boiler at least should be one time in a week that should be made e...

Страница 34: ...the warm surface and control panel should be made by only Baymak authorized services Komple davlumbaz temizliği sezonbaşı ve sonunda ve veya yakıta bağlı olarak gerektiğince yapılır The cover and control panel cleaning to be done at every 15 day and or and when it required was done Smoke pipes and temperature transition surface cleaning to be done once a week or more Inner boiler cleaning to be do...

Страница 35: ...don t load the fuel and call the Baymak authorized service Check if there is any electrical power If there is any damaged cable shut of the electrical power Discharge the boiler To have made electrical connection by authorized service If Electrical power was gone Open the by pass valve immediately Close all the doors and chimney clamp of the boiler To be sure if the return and out security lines a...

Страница 36: ...essary periodic maintenance and control 8 The responsibility of delivering of the warranty certificate to user belonging to who sold the goods to user whose are seller supplier agency or representative 9 Faulty installation faulty pipe connections faulty selection of capacity more than 3 Bar installation pressure inadequate chimney systems low or high voltage safety thermostat thermometer Faulty c...

Отзывы: