6
Step 1:
Connect a minimum of 60psi air pressure to the Regulator, approximately 28 in
3
/ batch.
Note: Customer to provide chemical supply tanks.
The Control Panel handles up to two separate
chemical pumping stations and each requires
calibration before treatment begins.
Note: Consult the Supply Tank manual for proper
installation and operation details.
Step 3:
Open the Pump Head.
• Insert one end of the Pump Element into the lower fitting on the inside of the Hopper Frame.
• Set the Pump Element on the Pump rollers.
• Connect the other end of the Pump Element to the elbow fitting connected to the top of the Hopper Frame.
• Close the Pump Head on the Pump Element.
Continued
INSERT OTHER END
OF PUMP ELEMENT
ELEMENT FROM FITTING
TO PUMP HEAD
To chemical inlet on Bowl Cover
INSERT ONE END OF
PUMP ELEMENT