RUNNING A CONTROL TEST:
There are times when you will want to do a quality control
test so you know that your system is working properly. You
may also want to do a control test to check the way you do
your test. Simply follow these steps:
Note: Look on the bottom flap of
the box of test strips to find the
control range.
Push out Test Strip
1. Hold the meter comfortably in one hand. Firmly grasp the
Meter Handle with the
other hand (shown
here). Now, just “Pull
and Push”—“Pull” the
handle out until it stops
and “Push” it back in
until it stops again.
12