2
3
4
5
1
D3928
(B)
(C)
6
5
3
1
4
2
9
8
10
10
7
L
mm
A
B
C
TECNO 34-L
160
224
M 8
TECNO 44-L
160
224
M 8
D455
D3867
(A)
5
INSTALLATION
!
THE BURNER MUST BE INSTALLED
IN CONFORMITY WITH LEGISLATION
AND LOCAL STANDARDS.
OPERATING POSITION (A)
!
The burner is designed to work only in
the positions
1
,
2
,
3
and 4
.
Installation
1
is preferable, as it is the
only one that allows performing maintenance
operations as described in this manual. Instal-
lations
2
,
3 and 4
permit operation but make
maintenance and inspection of the combus-
tion head difficult, page 14.
Any other position could compromise
the correct working of the appliance.
Installation
5
is prohibited for safety
reasons.
BOILER PLATE (B)
Drill the combustion chamber locking plate as
shown in (B). The position of the threaded holes
can be marked using the thermal screen sup-
plied with the burner.
BLAST TUBE LENGTH (C)
The length of the blast tube must be selected
according to the indications provided by the
manufacturer of the boiler, and in any case it
must be greater than the thickness of the boiler
door complete with its fettling. The range of
lengths available, L, is as follows:
Blast tube 7):
TECNO 34-L
TECNO 44-L
• short
216
216
• long*
351
351
* Kit supplied on request.
For boilers with front flue passes 10) or flame
inversion chambers, protective fettling in refrac-
tory material 8) must be inserted between the
boiler's fettling 9) and the blast tube 7).
This protective fettling must not compromise the
extraction of the blast tube.
For boilers having a water-cooled front the
refractory fettling 8)-9)(C) is not required unless
it is expressly requested by the boiler manufac-
turer.
SECURING THE BURNER TO THE BOILER (C)
Dismantle the nozzle assembly 7) and the pipe
coupling 5) from the burner 4):
- Remove the screws 2) from the two slide
bars 3).
- Remove the screw 1) and move the burner on
the guides 3).
Fix assembly 5) and 7) (C) to the boiler plate
and insert the supplied insulating gasket 6) C).
Use the four screws supplied after protecting the
thread with antiseizing products. The burner-
boiler seal must be airtight.
Содержание TECNO 34-L
Страница 2: ......
Страница 20: ......
Страница 38: ......
Страница 57: ...19 0 0 1 0 1 2 0 3 0 0 0 0 10 1 0 0 0 0 1 0 1 2 0 0 0 1 0 1 2 0 3 0 0 0 0 10 1 0 0 0 0 1 0 1 2 0 TECNO 34 L ...
Страница 58: ...20 0 1 1 0 2 3 0 0 0 1 1 1 1 0 2 0 TECNO 44 L ...
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...N 6119 6 1212 CE Baxi Calefacción S L U 2012 ...