92
910.001.1 - EN
ISTRUCTIONS PERTAINING TO THE INSTALLER
The pumps of the heating system (P1 and P2) have to be connected to boiler terminal block following the wir-
ing of figure 9, a relay must be wired between the boiler control circuit board and the pumps.
12.2 CONNECTING THE PUMPS
Figure 9
Terminal board
Terminal board
Terminal board
Cover
Cover
0902_1202 / CT_0676