background image

4.0 Legislation

7

© Baxi Heating UK Ltd 2008

4.1

Installation, Commissioning, Service & Repair

1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a

CORGI registered company and holding current certificates in
the relevant ACS modules, is deemed competent.

4. IN IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

Lifting -

This product should be lifted and handled by two

people. Stooping should be avoided and protective equipment
worn where necessary. Carrying & lifting equipment should be
used as required, e.g. when installing in a loft space.

All CORGI registered installers carry a CORGI identification
card and have a registration number. You can check your
installer is registered by telephoning 0800 915 0485 or writing
to:-

1 Elmwood, Chineham Park, Crockford Lane,

Basingstoke. RG24 8WG.

or check online at www.trustcorgi.com

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0087.

Product/Production certified by:
Notified Body 0086.

For GB/IE only.

4.2

Benchmark Commissioning Checklist

Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).

All installations must be notified to Local Area Building Control
either directly or through a Competent Persons Scheme. A
Building Regulations Compliance Certificate will then be issued
to the customer who should, on receipt, write the Notification
Number on the Benchmark Checklist.

This product should be serviced regularly to optimise its safety,
efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

The Benchmark Checklist may be required in the event of any
warranty work and as supporting documentation relating to
home improvements in the optional documents section of the
Home Information Pack.

If you smell gas

Turn off the gas supply at the meter and call your gas
supplier immediately.

Ventilate the property.

In GB, Transco operate a 24 hour emergency service and
the telephone number will be listed in your telephone
directory.

Faulty boiler

If it is known or suspected that a fault exists 
on the boiler, it must not be used until the fault 
has been corrected by a competent person.

Warning !

In an Emergency

If a water or gas leak occurs or is suspected, the boiler can be
isolated at the inlet valves as follows;

1. Using a suitable open ended spanner, turn the square nut
on the gas tap through 90° (

1

/

4

turn) in a clockwise direction

to isolate the gas supply at the boiler.

2. The isolating valves can be closed by turning their taps to
the right towards the wall.

3. Call your Installer or Service Engineer as soon as possible.

Содержание Potterton Suprima 30 HE

Страница 1: ...008 User Guide and Important Warranty Information Please keep these instructions in a safe place If you move house please hand them over to the next occupier Suprima HE Range Condensing Central Heating Boiler You can rely on ...

Страница 2: ...g details of the proposed use to the following address The Company Secretary Baxi Heating UK Ltd The Wyvern Business Park Stanier Way Derby DE21 6BF Full acknowledgement of author and source must be given WARNING Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages 1 0 Quick Reference Guide 3 2 0 Troubleshooting...

Страница 3: ... Boiler Turn the Boiler Temperature Control Knob clockwise to increase or anticlockwise to decrease the temperature Boiler Temperature Control Turn the Boiler Temperature Control Knob clockwise to increase or anticlockwise to decrease the temperature Resetting the Boiler If the Red Lockout Light is ON or FLASHING turn the temperature control knob to the off position and when the lockout light goes...

Страница 4: ... Light Green Check electrical supply to boiler is switched on NO YES Is the Green Burner ON Light lit Burner ON Light Green Boiler operating satisfactorily NO YES YES YES Is the Red Lockout Light illuminated or flashing YES Turn the Temperature Control Knob to the off position and when the red light goes off Turn control knob back to required setting Lockout Red Temperature Control Knob If the lig...

Страница 5: ...ples of external timer Ensure timer is set for Central Heating ON see any instructions supplied with timer NO YES YES NO 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown If you don t know what you need to do to get the boiler to light or need help with the system and controls contact your installer as soon as possible CH ON CH OFF ...

Страница 6: ...ouse does not become damaged or obstructed particularly by foliage 11 It is important that the condensate drain system is not blocked modified or damaged in any way as this would affect the operation of your boiler Your installer should have insulated any exposed pipework 3 2 Cleaning the Outercase The painted panels should be wiped with a damp cloth and then dried completely Do not use abrasive c...

Страница 7: ...rk Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales All installations must be notified to Local...

Страница 8: ...eer visit or for any general advice that you may need Our contact centre is open Monday to Friday 8am 6pm weekends and Bank Holidays 8 30am 2pm excluding Christmas Day and New Years Day When calling heateam it would be helpful if you could have the following information to hand 1 boiler serial number see opposite 2 boiler make and model number 3 Your installer name and address details 4 Proof of p...

Отзывы: