3) Manoeuvre the boiler into position so that the two spacer pips on the rear of the draught diverter
touch the wall.
4) Connect the water flow and return pipes (see Boiler Connections).
5) Connect the flue pipe, making sure that the flue trim is placed in position before the final
connection is made.
6) Partially fit the outer case.
7) Connect the electrical supply (see
).
8) Complete the installation (see
).
9) Complete the assembly of the outer case.
BOILER CONNECTIONS (
)
The boilers have 5 water connections:
2 x Rp1 (1 in BSP internal) return connections.
2 x Rp1 (1 in BSP internal) flow connections.
1 x Rp3/4 (3/4 in BSP internal) flow connection.
The 1 x Rp3/4 (3/4 in BSP internal) flow connection is for use when the pump is fitted inside the
outer case. For other installations this connection must be plugged. THE WATER SPREADER
MUST BE FITTED TO THE PUMPED RETURN CONNECTION ON ALL INSTALLATIONS. THE
MARKS ON THE SPREADER MUST BE BETWEEN THE TWO MARKERS ON THE
COMBUSTION CHAMBER (
).
The spreader has one mark on the 80, 70 and has two marks on the 60, 50, 40.
When installing the pipework ensure that:
a) Suitable union fittings are used at the first joint of all boiler connections.
b) The pipework will run through the cutouts provided in the outer case (
).
c) Drain off points are provided as appropriate.
d) Pipe sizes are suitable for the system design.
Pump (
A suitable pump e.g. Grundfos Selectric 4 or SMC Commodore with ball type isolating valves and
22mm compression fittings may be fitted inside the outer case.
The pump should be connected to the 3/4 in flow connection on the front of the heat exchanger
using the following standard fittings.
A
1 off
Elbow 3/4 BSP male x 3/4 BSP female
B
1 off
Conex straight connector 3/4 BSP male
x 22mm copper
C
3 off
22mm Yorkshire elbows
D
1 off
when installing the 60, 50 and 40
60mm long 22mm copper tube
D
1 off
when installing the 80 and 70
92mm long 22mm copper tube
E
1 off
100mm long 22mm copper tube
Содержание BOSTON 40 OF
Страница 9: ...fig 1 Pump in Casing Page 5 fig 2 Outer Case ...
Страница 10: ...fig 3 Boiler Connections Fig 4 Spreader in Pumped Return Connection fig 5 Clearances Work Tops ...
Страница 15: ...Page 8 Fig A One Zone Valve Fully Pumped System ...
Страница 16: ...Fig B Sundial Gravity System ...
Страница 17: ...Fig C 2 Zones Valve Fully Pumped System ...
Страница 20: ...fig 7 Burner Controls fig 8 Boiler Thermostat Page 10 ...
Страница 23: ...Fig 9 Insulation Combustion Box Door Fig 10 Baffle Securing Screws ...
Страница 24: ...fig 11 Door Burner 60 50 40 fig 12 Door Burner 80 70 ...
Страница 29: ...fig 16 Insulation Page 14 Short Parts List ...
Страница 30: ......