12
5.0
Installation - Page 12
5.1 Initial Preparation
1. Remove the outer carton from the boiler pack and locate
the fitting kit. Remove and discard the packing pieces.
2. Remove the boiler hood from it’s packing on top of the
boiler. The hood may be fitted now or when the boiler is in
situ. Use the four nuts and set screws provided (Fig. 8).
3. The boiler as supplied has the flow and return water
connections at the left hand side of the appliance.
5.2 For installations requiring the water connections at
the right hand side proceed as follows:
1. Remove the thermostat capillary from its clip. Withdraw
the thermostat phial from the pocket. Lift away the insulation
pad (Fig. 8a) and unfasten the four screws retaining the
boiler door and remove. Remove the rubber seal and
thermostat protection cover (Fig. 9).
2. Lift out the 3 heat exchanger baffles, noting their
orientation (Fig. 10).
3. Lift the heat exchanger from the appliance and remove
the side blanking plate (Fig. 11).
4. Transfer the 3 sealing rings from the holes in the left hand
side of the boiler to those in the right (Fig. 11).
5. Rotate the heat exchanger to place the water connections
at the right hand side, return the heat exchanger to the
combustion box.
DO NOT TURN THE HEAT EXCHANGER UPSIDE DOWN
NOTE: The heat exchanger is correctly oriented when
the three water connections line up with the holes in the
right hand side of the combustion box and the
thermostat pocket aligns with the corresponding hole in
the door. The unfinned heat exchanger water tubes face
the burner.
6. Remove the blanking disc from the left hand hole in the
boiler door and replace with the rubber seal and thermostat
protection cover. Fit the blanking disc into the right hand hole
(Fig. 12).
7. Replace the heat exchanger baffles and blanking plate.
Refit boiler door. Refit the thermostat phial into the pocket.
Содержание Bermuda Inset 2 Boiler 50/4
Страница 26: ...26 and 27 9 0 Fault Finding Pages 26 and 27 ...