![Baxi 961 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/baxi/961/961_installer-and-owner-manual_2712046028.webp)
INSTALLER GUIDE
Page 28
12. FITTING THE WINDOW FRAME ASSEMBLY
1.
Locate the window mounting frame and
window assembly in place.
2.
Secure in place using the six screws
removed previously.
13. FULL OPERATING CHECKS
13.1 Checking the control settings.
Please note:
When first turned on from cold, the flames will appear predominantly blue. It is
normal for condensation to form on the rear of the window assembly. The
condensation will disappear after a few minutes use.
When operating the fire for the first time, some vapours may be given off which
could set off smoke alarms in the vicinity. These vapours are quite normal with new
appliances. They are totally harmless and will disappear after a few hours use
.
Depending upon the fascia fitted to the fire,
after lighting the fire it is possible to
have a light coating of condensation form on the upper surface of the fascia and the
area immediately above this. This should disappear in approximately five minutes and
is no cause for concern.
1.
Refit the battery if previously removed.
2.
Make sure the slider button is at the off position (At topmost position).
3.
Slide the button to the bottom (ignition) position. Retain in this position to ignite the
pilot. The burner should ignite at its lowest setting within 4 seconds of the pilot
igniting. Keep at this position for a further 10 seconds to allow the pilot flame to
©
Baxi Heating U.K. Limited 2010.
Figure 27. Window mounting frame and
window assembly removal
Содержание 961
Страница 43: ...Page 43 Baxi Heating U K Limited 2010 OWNER GUIDE OWNER GUIDE ...
Страница 53: ... Baxi Heating U K Limited 2010 ...
Страница 54: ... Baxi Heating U K Limited 2010 ...
Страница 55: ... Baxi Heating U K Limited 2010 ...
Страница 56: ... Baxi Heating U K Limited 2010 ...