CONTENTS (Continued)
Section
Heading
Page
10. FULL OPERATING CHECKS
24
10.1 Spillage check.
24
10.2 Flame Supervision & Spillage Monitoring System.
25
10.3 Final Review.
25
11. SERVICING & PARTS REPLACEMENT
26
11.1 Checking the aeration setting of the burner.
26
11.2 To remove the complete burner unit.
26
11.3 To remove the pilot unit.
27
11.4 To remove the gas valve.
27
11.5 To remove the piezo generator.
28
11.6 To grease the control tap.
28
11.7 To replace the burner.
28
11.8 To remove the main burner injector.
28
Page 6
© Baxi Heating U.K. Limited 2009.
INSTALLER GUIDE