2916089
10
GB
Installation
4.3
Boiler plate (Fig. 6)
Drill the combustion chamber locking plate as shown in (Fig. 6).
The position of the threaded holes can be marked using the ther-
mal screen supplied with the burner.
4.4
Blast tube length (Fig. 7)
The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its refractory.
For boilers with front flue passes 12) or flame inversion cham-
bers, protective fettling in refractory material 10) must be inserted
between the boiler's fettling 11) and the blast tube 9).
This protection must not compromise the extraction of the blast
tube.
For boilers having a water-cooled front the refractory fettling 10)-
11) (Fig. 7) is not required unless it is expressly requested by the
boiler manufacturer.
4.5
Securing the burner to the boiler (Fig. 8
Disassemble the blast tube 9) from the burner 6) by proceeding
as follows:
– Loosen the four screws 3) and remove the cover 1).
– Remove the screws 2) from the two slide bars 5).
– Remove the two screws 4) fixing the burner 6) to the flange 7).
– Withdraw the blast tube 9) complete with flange 7) and slide
bars 5).
Combustion head calibration
At this point check, for model TECNO 130-L, whether the maxi-
mum delivery of the burner in 2nd stage operation is contained in
area B or in area C of the firing rate. See pag. 8.
If it is in area B then no operation is required.
If, on the other hand, it is in area C:
– Unscrew the screws 1) (Fig. 8) and disassemble the blast tube
5)
– Unscrew the screws 3) and remove the shutter 4)
– Tighten the screws 3) on the rod 2)
– Now refit the blast tube 5) and the screws 1)
Once this operation has been carried out (if it was required), se-
cure flange 7) (Fig. 7) to the boiler plate interposing the supplied
gasket 8). Use the 4 screws provided after having protected the
thread with anti-seize products (high-temperature grease, com-
pounds, graphite).
The burner-boiler seal must be airtight.
D455
Fig. 6
mm
A
B
C
TECNO 70-L
185
275
M 12
TECNO 100-L
185
275
M 12
TECNO 130-L
195
275
M 12
D3307
Fig. 7
Fig. 8
D690