
5. Options, Accessories and Ordering Information
5-6
Mains voltage
220-230V 110-120V*)
240V
High Voltage Test Set PGK 110 HB with accessories
411-017
411-117
411-217
Operating unit
470-444
470-445 470-446
High Voltage unit
470-449
470-449 470-449
Discharge bar ES 110 18kWs
411-511
411-511
411-511
Mains connection
554-015
554-016 554-017
Connecting cable H.V. / Operating unit, 5 m
471-933
471-933 471-933
Earth lead, 3 m
460-462
460-462 460-462
High Voltage connection, 2,5 m with alligator clip
460-477
460-477 460-477
Spanner for replacing
rectifier / resistor bar
460-459
460-459 460-459
Rectifier bar (built in)
470-439
470-439 470-439
Resistor bar for A.C. operation
470-440
470-440 470-440
Moving frame High Voltage unit
470-577
Folding tripod for 19" units,
working height approx. 90 cm
411-536
Automatic discharge device EM 110, 45kWs
470-622
Emergency Off unit with signal lamps, 25 m
471-219
Emergency Off unit with signal lamps, 50 m
470-809
Transport case for H.V. / Operating unit (WxHxD)
670x1680x760 mm
471-179
Ordering information PGK 110 HB
Items supplied
Ordering information PGK 150 HB
220-230V 110-120V*)
240V
High Voltage Test Set PGK 150 HB with accessories
411-013
411-113
411-213
Operating unit
470-016
470-017 470-018
High Voltage unit
470-044
470-044 470-044
Discharge bar ES 150
411-512
411-512
411-512
Mains connection
554-015
554-016 554-017
Connection cable H.V. / Operating unit, 5 m
471-933
471-933 471-933
Earth lead, 3 m
460-462
460-462 460-462
High Voltage connection, 2,5 m with alligator clip
460-477
460-477 460-477
Spanner for replacing
rectifier / resistor bar
460-459
460-459 460-459
Rectifier bar (built-in)
470-057
470-057 470-057
Resistor bar for A.C. operation
470-058
470-058 470-058
Moving frame High Voltage unit
470-577
Folding tripod for 19" units,
working height approx. 90 cm
411-536
Automatic discharge device EM 150, 45kWs
470-624
Emergency Off unit with signal lamps, 25 m
471-219
Emergency Off unit with signal lamps, 50 m
470-809
Transport case for H.V. / Operating unit (WxHxD)
720x720x1970 mm
471-178
Mains voltage
Items supplied
Options
Options
*): Delivery includes external autotransformer; mains connection cable without
termination, fix mounted
*): Delivery includes external autotransformer; mains connection cable without
termination, fix mounted
Содержание PGK 110 HB
Страница 2: ...0 2 ...
Страница 12: ...1 6 1 Product Information PGK output load curves ...
Страница 13: ...1 7 1 Product Information ...
Страница 18: ...2 Packing and Shipping Notes 2 2 ...
Страница 24: ...3 Placing into Operation 3 6 Notes ...
Страница 34: ...5 Options Accessories and Ordering Information 5 8 Notes ...