
4. Servicing / Maintenance
4-2
General
•
In order to avoid leakage currents or creeping discharges at the
tube or cone of the High Voltage unit it must be kept clean. For
this purpose, use only fuzz-free clothes dampened in petroleum
ether.
•
From time to time, check function of limiter lamps in the
operating unit. This can be easily carried out in short-circuit
operation by slowly increasing the voltage at the variable
transformer until lamps light up.
•
Oil for refilling around the rectifier or resistor bar is available from
BAUR.
•••••
0.8lt insulation oil Technol US 4000
ID no. 471-716
Fuse
☞
Designation
Value
Dimension
Ident.No.
Remarks
F1, F2
0,16 AT
Ø 5 x 20 mm
563-005
Mains transformer, primary
F3, F4
2 AF
Ø 5 x 20 mm
563-020
+ 12V control
F5, F6
3,15 AT
Ø 5 x 20 mm
563-021
Discharge unit (option)
(S4, F10)
16 AT
Mains switch
F11
PGK 70 HB
2 A
High voltage transformer, primary
PGK 110 HB
6 A
High voltage transformer, primary
PGK 150 HB
6 A
High voltage transformer, primary
PGK 260 HB
10 A
High voltage transformer, primary
PGK 70/2,5 HB
14 A
High voltage transformer, primary
Содержание PGK 110 HB
Страница 2: ...0 2 ...
Страница 12: ...1 6 1 Product Information PGK output load curves ...
Страница 13: ...1 7 1 Product Information ...
Страница 18: ...2 Packing and Shipping Notes 2 2 ...
Страница 24: ...3 Placing into Operation 3 6 Notes ...
Страница 34: ...5 Options Accessories and Ordering Information 5 8 Notes ...