Commissioning
54
Mono Power Unit BUM 62 T
5.99009.03
Baumüller Nürnberg GmbH
”Supply part ready”
When the ”Monitoring function of the supply part” does not recognize any errors, the monitoring function
generates the message ”Supply part ready”.
y
If the message ”Supply part ready” is cleared by the monitoring function, the BUM 62 T
disconnects the load from the drive, i.e. the units does no longer supply a torque.
The BUM 62 T displays this message using an LED and supplies it to relay contacts at the same time.
For more information refer to ”Messages via LEDs” page 60 and ”Messages via relay contacts” page 61.
The ”Supply part ready” is also referred to as "Internal ready" (terminal designation BBint)
or "External ready" (terminal designation BBext).
Both messages are identical. The difference lies in the internal structure of the unit.
At the output of the supply part, ”Supply part ready” is also referred to as ”Internal ready”. After the
message of the unit has been passed on to the power part, the message ”Supply part ready” is referred
to as ”External ready”.
”Power part on the motor side ready”
When the ”Monitoring function of the power part on the motor side” does not recognize and errors, the
monitoring function generates the message ”Power part on the motor side ready”.
y
If the message ”Power part on the motor side ready” is cleared by the monitoring function,
the BUM 62 T disconnects the load from the drive, i.e. the units does no longer supply a
torque.
”Controller ready”
The V controller was mentioned at the beginning of this section. It may be possible that you use another
controller. Therefore, we will not provide any further information and refer to the corresponding
documentation. The documentation of your controller provides information on whether the message
”Controller ready” is available in the controller you are using and how you can process this message, if
available.
”Completely ready”
The above mentioned information applies here as well. The documentation of your controller provides
information on whether the message ”Completely ready” is available in the controller you are using and
how you can process this message, if available.
Содержание BUM 62 T
Страница 1: ...E 5 99009 03 Manual BUM 62 T Mono Power Unit ...
Страница 6: ...6 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 10: ...Safety notes 10 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 16: ...Technical data 16 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH 3 3 Block diagram ...
Страница 18: ...Transportation Unpacking 18 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 21: ...Assembly Mono Power Unit BUM 62 T 21 Baumüller Nürnberg GmbH 5 99009 03 Installation Dismantling ...
Страница 22: ...Assembly 22 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 39: ...Installation Mono Power Unit BUM 62 T 39 Baumüller Nürnberg GmbH 5 99009 03 6 5 Connection diagram ...
Страница 48: ...Installation 48 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 73: ......