2. START-UP

 

 

2.1. Delivery details

 

 

The BAUMOT shuttle kiln is generally delivered by a transport company. The 
delivery must always be inspected for damage to the packaging immediately upon 
delivery. Should damage be evident, unpack the delivery together with the driver and 
inspect the goods for signs of damage. Write a description of all signs of damage on 
the delivery slip. It is essential to have the driver countersign the document. Retain a 
copy of the damage complaint. Inform the transport company of the damage 
immediately. Subsequent complaints will not be considered. 

 

 
 

2.2. Operation area/assembly site requirements 

 
Select a suitable location that complies with the following rules and prepare the 
location accordingly:

 

 

 

General assembly information: 

 

• 

Place the shuttle kiln on an even surface. 

• 

There must be at least 50 cm of space between all sides of the kiln and the 
walls. 

• 

The floor, ceiling insulation, walls, dividing walls, covers, etc. must be made of 
heavy-duty inflammable materials. 

• 

Ensure  that  the  assembly  site  is  well  ventilated.  Otherwise  an  exhaust  unit 
must be installed. In all cases, a ventilation technician must be consulted. 

 

 
 

2.3. Power source information/RC device

 

 

To operate the kiln in workshops, laboratories, etc., it is imperative that a separate 
power supply with its own safeguard be prepared. If the building network is 
safeguarded by a circuit interrupter, then the operation of the heat-treatment and 
annealing furnaces must also be operated from and safeguarded by an RC device 
(ground fault circuit interrupter) with a rated current of 0.03 A. 

 

If necessary, the power supply for the workshop area must be retrofitted with a 
RC device that has a release current of >300mA. 

 

An RC device with a lower release current can cause premature release and impede 
the heat-treatment process.

Содержание B 200

Страница 1: ...Operating Manual Electric Kiln B 200 ...

Страница 2: ...2 3 Power source information RC device 5 2 4 Firing with the kiln 6 3 General operating information 7 3 1 Operating the control unit 7 3 2 Entering program Starting program 7 3 3 The exhaust air hole 10 3 4 The air intake opening 10 3 5 Proper handling during firing 11 4 Maintenance care and cleaning 12 5 Trouble shooting tips 13 5 1 The control unit 13 5 2 The combustion chamber 13 6 Warranty obl...

Страница 3: ...y information in its entirety prior to starting up the shuttle kiln Keep the operating instructions in a safe place for future reference 1 2 Safety Information Caution Hot surface Do not open when kiln is hot Caution Disconnect the kiln from the mains prior to opening the electric panel Caution Voltage carrying components Risk of fatal injury The CE mark verifies that the conformity assessment pro...

Страница 4: ...rmation is observed In commercial enterprises the kiln and control unit must be inspected by a qualified electrician for proper and optimal functioning condition in accordance with BGV A3 German equipment testing procedure prior to start of operation and every 4 years Repairs and maintenance procedures on electric components may only be carried out by a qualified electrician For safety reasons the...

Страница 5: ...here must be at least 50 cm of space between all sides of the kiln and the walls The floor ceiling insulation walls dividing walls covers etc must be made of heavy duty inflammable materials Ensure that the assembly site is well ventilated Otherwise an exhaust unit must be installed In all cases a ventilation technician must be consulted 2 3 Power source information RC device To operate the kiln i...

Страница 6: ...ry for firing ceramic diesel particle filters The preheating phase takes approx 1 hour during which the temperature is increased up to 550 C with a subsequent holding time of 3 5 or 8 hours Therefore the firing time without the cooling phase takes either 4 6 or 9 hours The temperature for ceramic filters may not exceed 550 C ...

Страница 7: ...nal temperature Button Description Display To access the USER menu press the P button USER appears in the green display Button Description Display To access the set temperature menu item press the P button again SET appears in the green display Button Description Display To activate the set temperature menu item press the P a third time SET flashes in the green display ...

Страница 8: ...To save the entered program values press the P button Entering program set value of gradient Button Description Display To access the gradient menu item press the button rA appears in the display Button Description Display To activate the gradient menu item press the P button rA is flashes in the display Button Description By pressing the button you can increase the gradient value and with the but...

Страница 9: ...re with the aid of the time selector switch 3 h position Holding time of final temperature is 3 hours 5 h position Holding time of final temperature is 5 hours 8 h position Holding time of final temperature is 8 hours Starting stopping the program The firing program is started by pushing the Exit F button The program is stopped by pushing the button once again ...

Страница 10: ...ey stone included in delivery Caution Do not look directly into the exhaust air hole when the kiln is hotter than 150 C This can cause injury to the face Operating personnel must wear adequate protective clothing Baumot GmbH will not accept liability for personal injury or material damage ...

Страница 11: ...ar the kiln Unauthorised persons should not be permitted to remain in the area Caution The loading process may only be carried out by trained employees Use suitable loading aids to facilitate the loading process Caution In the event of an unforeseen incident take appropriate safety measures if the kiln has to be opened at high temperatures Operating personnel must wear adequate protective clothing...

Страница 12: ...ts and the bricks In the event of a serious incident contact us or your local specialist dealer Heating coils are subject to wear Their resistance ohm increases with each firing and with time causes a delay in the firing curve due to a decline in performance particularly in the higher temperature range In the case of extreme wear we recommend replacing all of the heating coils because replacing in...

Страница 13: ...es in the junction box of the kiln They must be protected with T 2A 5 2 The combustion chamber is not heating up or is kiln is heating up very slowly Check if the cover of the kiln is completely closed It is possible that the safety switch is not closing the safety circuit The set temperatures are not achieved The control unit is indicating an error Examine the heating conductor for signs of break...

Страница 14: ...amages caused by improper handling Please note The lightweight refractory bricks used in the brick lining are subject to severe temperature fluctuations This can cause cracking in the brick lining This is normal and does not interfere with the function of the shuttle kiln They are therefore also not cause for a complaint What to do in a warranty case or in case of damage Inform your local speciali...

Страница 15: ... listed in this operating manual are not specifically indicated because they are commonly known These names and designations can however be the property of companies or institutes 8 SERVICE ADDRESSES If you have questions regarding your kiln replacement parts or additional accessories please contact your specialist dealer or Baumot GmbH We wish you much success and only good firing results Your Ba...

Отзывы: