
LATION
INSTAL
The installation must be carried out by a suitably
rm
Scottish Development
necting the appliance, make sure that the supply voltage
essible position adjacent to the appliance. The spur
outlet must still be accessible even when your oven is located in
its housing.
nnection, securing the cord in place with the
cable clamp provided and then immediately close the terminal
ange the oven power cord, the earthing
(yellow/green) conductor must always be 10 mm longer than the
Care must be taken to ensure that the temperature of the mains
mm²
qualified person, in accordance with the current
version of the following.
o
UK Regulations and Safety Standards or their European No
Replacements.
o
Building Regulations (issued by the Department of the
Environment).
o
Building Standards (issued by the
Department).
o
IEE Wiring Regulations.
o
Electricity At Work Regulations.
Before con
marked on the rating plate corresponds with your mains supply
voltage.
WARNING: THIS APPLIANCE MUST BE EARTHED.
o
This appliance should be wired into a 30 A double pole switched
fused spur outlet, having 3 mm contact separation and placed in
an easily acc
o
To connect the oven power cord, loosen and remove the cover
on the terminal block, in order to gain access to the contacts
inside. Make the co
block cover again.
o
If you have to ch
line conductors.
o
supply cable does not exceed 50°C.
o
If the mains supply cable is damaged, then it must be replaced
by an appropriate replacement.
o
Cable type: H05 RRF 3 core x 2.5
26
Содержание PO900SS
Страница 1: ...Ng c 1 PO900SS 60 cm Built in multifunction self cleaning pyrolytic double oven...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ...36...