21
the other burners and observe that the gas pressure complies
with the gas standards in force.
o
IMPORTANT: On completion carry out a gas soundness
test.
Gas adjustment (Conversion to LPG)
All work must be carried out by a GASSAFE
registered engineer.
IMPORTANT: Always isolate the hob from the electricity supply
before changing the injectors and/or adjusting the minimum
flow of the burners.
o
Remove the pan-stands, burners and
flame spreaders
(A)
.
o
Unscrew the injector
(B)
and replace it
with the stipulated injector for the new gas
supply (see table below).
GENERAL INJECTORS TABLE
Power (in watts)
Kind of gas
Nozzle
mm/100
Burners
Max.
Min.
Natural
95/55/95
129
97
76
Wok
Rapid
Semi-rapid
Auxiliary
3800
3000
1750
1000
1700
1500
900
500
L.P.G.
Butane
Propane
65/41/65
87
65
51
Wok
Rapid
Semi-rapid
Auxiliary
3800
3000
1750
1000
1300
700
400
350
Содержание HHG610SS
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28 United Kingdom 6 Bennet Road Reading Berkshire RG2 0QX United Kingdom Customer Care 0118 933 6918...