
MNL-126509
April 4, 2013
Page 23
3.1.8.3
Changing the IK120 II C & G, 1st Stage Valve
The intake and pressure valve of the IK120 II C & G 1st stage are in a combined plate valve under the
valve head. Refer to Figure 3-11
1. Remove Valve Head (1).
2. Note orientation of Plate Valve (32) before removing it.
3. Reassembly is the reverse of the above steps. Ensure that the Plate Valve mark “TOP” is facing up.
Figure 3-11
IK120 II C 1st Stage Valve Head and Plate Valve
1
2
Содержание G 120 II V
Страница 45: ...1 2 3 4 5 9 8 6 10 7 This page is inserted to provide proper page sequencing...
Страница 51: ...1 2 3 4 5 9 8 6 10 7 This page is inserted to provide proper page sequencing...
Страница 101: ...1 2 3 4 5 9 8 6 10 7 This page is inserted to provide proper page sequencing...
Страница 136: ......