13. Secure the
Generator assembly (37)
to the back corner of the tray with
Round head
screw ST4.2×25 (17)
. See Fig 15 for details.
14. Apply silicone sealant on the top of the acrylic panels. Secure the roof to the back panel,
side panel, shelf panel and the control panel with
Round head screw ST4.2×25 (17)
and
Bolt M6×20 (23)
. See Fig 16 for details.
15. Connect the shower head connector and its hose. Pool all wires from roof electric
components (Depending on your model and futures) down to the steam generator
compartment. Fig 17.
16. Move the shower cabin assembly to the required position. Fig 18.
17. Measure the distance from straight part of the elbow or bushing to the top of the drain
less 1/2”. See Fig 19/1 and Fig 19/2. Cut peace of the 2” PVC pipe according the
measurements. See Fig 19/2 and Fig 19/3. Clean PVC pipe and elbow according the
PVC glue manufactory instructions. Apply the PVC glue to the elbow and PVC pipe and
push pipe down into elbow. Hold it for 45 sec to 1 min to glue it together. Fig 19/4, 19/5,
19/6.
18. After the glue had been dried finish the assembling of the drain according with drain
manufactory instruction. Fig 19/7, 19/8, Fig 20.
19. Locate the
wall profile (11)
from the package then place it vertically above the tray.
Using a level to adjust the wall profile upright; then use predrilled aluminum profile holes
to marks wall for drilling. Now drill the holes and insert the
Wall anchor (18)
into the
holes. Apply silicone sealant along the holes on the wall. Use
Round head screw
ST4.2×25 (17)
to attach the wall profile to wall. See Fig 21 and Fig 22 for details.
20. Connect hot water supply hose to the water inlet marked with red and cold water to the
blue mark water inlet. See Fig 23 for details.
21. Connect the steam generator circuit, according wiring diagram. Connect power cable
(not supplied) to the power supply box. Wires marked L1 and L2 are HOT wires, G –
ground. Connect yellow wire from the steam generator to the ground. See Fig 24 and
Fig 31 for details. (
Use the corresponding electrical connection or plug according
to the local power system standards
).
22. Remove the back fastener from the pivot assemblies. Set the
Glass door (08)
so the
holes are aligned. Make sure the rubber gaskets are in between the glass and the metal
parts. Secure the back fastener with the provided bolt. Repeat the same steps for the
second pivot assembly. See Fig 25 for details.
23. Install the
Glass door handle (13)
to the glass door. Don’t forget to use rubber gaskets
between the glass and washers. Attach
Magnetic strips (19)
onto the glass door and
the narrow stationary panel, the
Bottom anti-water strip (21)
and the
Anti-water strip
(20)
to seal between the glass door and the wide stationary glass. See Fig 26 for details
24. Adjust the position of the pivot bars and stationary glass on the tray. Mark the drill holes
for the
Glass brackets (30)
. Make sure the mark is clear and visible and drill the hole
on the mark. Use the
Round head screws ST4.2×25 (31)
to attach the
Glass bracket
(30
) to the tray or the roof. Cover the screw location with
Decorative cover (32)
. See
Fig 27 for details.
25. Connect the flexible hose to the foot massager and hand shower. Secure these two
items in place on the back panel. Make sure all the water connections are water tight.
See Fig 28 for details.
26. Check all the components for any leakage or problems; open each valve to see
how it works, check thermostatic or mixer valve for hot and cold water. You may
need to tight some connections (during storage and transportation connections
may get loose).
27. If you do not see any leakage, install the maintenance door handle. Push the
glass
profile
of the maintenance door over the
wall profile
. Secure the
glass profile
and
narrow stationary glass profile
using
Bolt (15)
. See Fig 29 for details.
28. Seal with silicone on all the connections between the vertical profiles and the back
panel, bottom rail and tray, tray and back panel. Let the silicone dry for at least 24 hours
before moving or using the cabin.
Rev. 1. 3.
7
Содержание DreamLine Neptune
Страница 9: ...Fig 5 Fig 6 Fig 7 Fig 8 1 2 1 2 Rev 1 3 9...
Страница 10: ...Fig 9 Fig 10 Fig 11 Fig 12 1 2 1 2 3 3 Rev 1 3 10...
Страница 11: ...Fig 13 Fig 14 Fig 15 Fig 16 1 2 3 4 5 1 2 3 3 Rev 1 3 11...
Страница 12: ...Fig 17 Fig 18 L L Fig 19 Fig 20 1 2 3 4 5 6 7 8 Rev 1 3 12...
Страница 13: ...11 16 Fig 21 Fig 22 L1 L2 N L1 L2 N Fig 23 Fig 24 6 1 2 3 4 5 Blue Red Cool Red Rev 1 3 13...
Страница 14: ...Fig 25 Fig 26 Fig 27 Fig 28 1 2 3 1 2 1 2 3 1 2 3 Rev 1 3 14...