Bath Authority DreamLine Neptune Скачать руководство пользователя страница 7

 
13. Secure  the 

Generator assembly (37)

 to the back corner of the tray with 

Round head 

screw ST4.2×25 (17)

. See Fig 15 for details. 

14. Apply silicone sealant on the top of the acrylic panels. Secure the roof to the back panel, 

side panel, shelf panel and the control panel with 

Round head screw ST4.2×25 (17)

 

and 

Bolt M6×20 (23)

. See Fig 16 for details.  

15. Connect the shower head connector and its hose. Pool all wires from roof electric 

components (Depending on your model and futures) down to the steam generator 
compartment. Fig 17. 

16.  Move the shower cabin assembly to the required position. Fig 18.  
17. Measure the distance from straight part of the elbow or bushing to the top of the drain 

less 1/2”. See Fig 19/1 and Fig 19/2. Cut peace of the 2” PVC pipe according the 
measurements. See Fig 19/2 and Fig 19/3.  Clean PVC pipe and elbow according the 
PVC glue manufactory instructions. Apply the PVC glue to the elbow and PVC pipe and 
push pipe down into elbow. Hold it for 45 sec to 1 min to glue it together.  Fig 19/4, 19/5, 
19/6.   

18. After the glue had been dried finish the assembling of the drain according with drain 

manufactory instruction. Fig 19/7, 19/8, Fig 20.  

19. Locate  the 

wall profile (11)

 from the package then place it vertically above the tray. 

Using a level to adjust the wall profile upright; then use predrilled aluminum profile holes 
to marks wall for drilling. Now drill the holes and insert the 

Wall anchor (18)

 into the 

holes. Apply silicone sealant along the holes on the wall. Use 

Round head screw 

ST4.2×25 (17)

 to attach the wall profile to wall. See Fig 21 and Fig 22 for details. 

20. Connect hot water supply hose to the water inlet marked with red and cold water to the 

blue mark water inlet. See Fig 23 for details.  

21. Connect the steam generator circuit, according wiring diagram. Connect power cable 

(not supplied) to the power supply box. Wires marked L1 and L2 are HOT wires, G – 
ground. Connect yellow wire from the steam generator to the ground. See Fig 24 and 
Fig 31 for details. (

Use the corresponding electrical connection or plug according 

to the local power system standards

). 

22. Remove the back fastener from the pivot assemblies. Set the 

Glass door (08)

 so the 

holes are aligned. Make sure the rubber gaskets are in between the glass and the metal 
parts. Secure the back fastener with the provided bolt. Repeat the same steps for the 
second pivot assembly. See Fig 25 for details. 

23. Install  the 

Glass door handle (13) 

to the glass door. Don’t forget to use rubber gaskets 

between the glass and washers. Attach

  Magnetic strips (19) 

onto the glass door and 

the narrow stationary panel, the

 Bottom anti-water strip (21)

 and the

 Anti-water strip 

(20)

 to seal between the glass door and the wide stationary glass. See Fig 26 for details 

24. Adjust the position of the pivot bars and stationary glass on the tray. Mark the drill holes 

for the 

Glass brackets (30)

. Make sure the mark is clear and visible and drill the hole 

on the mark. Use the

 Round head screws ST4.2×25 (31)

 to attach the 

Glass bracket 

(30

) to the tray or the roof. Cover the screw location with

 Decorative cover (32)

. See 

Fig 27 for details. 

25. Connect the flexible hose to the foot massager and hand shower. Secure these two 

items in place on the back panel. Make sure all the water connections are water tight. 
See Fig 28 for details. 

26. Check all the components for any leakage or problems; open each valve to see 

how it works, check thermostatic or mixer valve for hot and cold water. You may 
need to tight some connections (during storage and transportation connections 
may get loose).  

27. If you do not see any leakage, install the maintenance door handle. Push the 

glass 

profile

 of the maintenance door over the 

wall profile

. Secure the 

glass profile

 and 

narrow stationary glass profile

 using 

Bolt (15)

. See Fig 29 for details. 

28. Seal with silicone on all the connections between the vertical profiles and the back 

panel, bottom rail and tray, tray and back panel. Let the silicone dry for at least 24 hours 
before moving or using the cabin. 

Rev. 1. 3. 

7

Содержание DreamLine Neptune

Страница 1: ...nstalling your shower cabin If you have any questions on this shower cabin installation please call our technical support specialists Monday to Friday 9 00AM 5 00PM EST at 1 866 731 8378 Option 3 or e...

Страница 2: ...ed off any remaining hot water in the steam generator system is automatically drained into the shower cabin For your safety please do not turn off the power button on the control unit until you are re...

Страница 3: ...lectric shock due to high voltage that runs in the equipment Follow these steps to avoid the risk of overheating or scalding 9 Exit the shower cabin immediately if you feel uncomfortable dizzy or slee...

Страница 4: ...ation and DreamLine is not responsible for code compliance standards for your project 3 Install all of the required plumbing and drainage before securing the shower Use a competent and licensed if req...

Страница 5: ...tionary glass 1pc 28 Flat head bolt M8 20 4pcs 10 Maintenance door 1pc 29 Washer 4pcs 11 Wall profile 1pc 30 Glass bracket 4pcs 12 Handle for maintenance door 1pc 31 Round head screw ST4 2 25 4pcs 13...

Страница 6: ...panel 02 and the tray with Bolt M6 40 22 See Fig 5 and Fig 6 for details NOTE For steps 6 7 and 8 it will be necessary to apply silicone sealant between the panels and the panels and tray 7 Connect th...

Страница 7: ...llow wire from the steam generator to the ground See Fig 24 and Fig 31 for details Use the corresponding electrical connection or plug according to the local power system standards 22 Remove the back...

Страница 8: ...9 7 8 9 7 8 2 2 PVC pipe support Fig 1 Fig 2 41 3 4 4 47 1 4 power 1 2 screw connector 35 1 8 Fig 3 Fig 4 Rev 1 3 8...

Страница 9: ...Fig 5 Fig 6 Fig 7 Fig 8 1 2 1 2 Rev 1 3 9...

Страница 10: ...Fig 9 Fig 10 Fig 11 Fig 12 1 2 1 2 3 3 Rev 1 3 10...

Страница 11: ...Fig 13 Fig 14 Fig 15 Fig 16 1 2 3 4 5 1 2 3 3 Rev 1 3 11...

Страница 12: ...Fig 17 Fig 18 L L Fig 19 Fig 20 1 2 3 4 5 6 7 8 Rev 1 3 12...

Страница 13: ...11 16 Fig 21 Fig 22 L1 L2 N L1 L2 N Fig 23 Fig 24 6 1 2 3 4 5 Blue Red Cool Red Rev 1 3 13...

Страница 14: ...Fig 25 Fig 26 Fig 27 Fig 28 1 2 3 1 2 1 2 3 1 2 3 Rev 1 3 14...

Страница 15: ...ater Fig 31 1 2 3 4 Control Panel Electronic Control Box Steam generator Power wire Steam wire Steam control wire Control panel cable Top light power cable Temperature probe Ground cable Steam outlet...

Страница 16: ...erature for all valves you are using Mixer Valve z Valve a turns on water for the tropical rain head shower z Valve b turns on water for massage jets z Valve c turns on water for the waterfall head sh...

Страница 17: ...et mode push the time or time key to get desired time of the steam bath The time range is 5 60 minutes Lighting Push the light key and the light can be switched on or off Switch off Push the power key...

Страница 18: ...ch as acetone gasoline or thinners Do not use ammonia based cleaning solutions on the acrylic as it will eat into the surface and cause it to damage How do you get scratches out of Acrylic For light s...

Страница 19: ...ood act of God or any other casu alty Improper care and cleaning will void the warranty Use of cleaners containing abrasive cleansers ammonia bleach acids waxes alcohol solvents or other products not...

Отзывы: