Cabin Installation
1. Choose the location where you cabin will be installed. Mark the location of the tray.
Install the drain pipe according to drawing Fig 1. Be sure the upper edge of the 2” elbow
or bushing will be on the level or below the floor level Fig 2.
2. Prep the floor where the cabin will be installed. Floor must to be
leveled
, strong enough
and solid and will be able to support the total weight of the unit and its occupant.
3. Install the drain to the tray according the drain installation manual (supplied by drain
manufactory) Fig 3.
4. Move the
Tray (06)
to the required position.
Check the level of the tray, alignment of the
drain pipe and the drain (Fig 4). If drain pipe need to be adjusted do it now. If tray in not
leveled, move tray out and re-level floor. Place tray back and check it again.
5. Install the water outlet and power supply box. You need 1/2” minimum water supply
lines for hot and cold water with shout off valves.
Power supply is required 20A 220v
dedicated #12/3 romex wire line with GFCI breaker.
Please check your local codes
before wiring as your local requirements may be different.
(
Note:
Figure 4 shows
water and power location for the control panel to be installed on the left side of the tray.)
Your unit is reversible for right or left hand installation. If the control panel is
planned to be on the right side of the tray, the location of the water outlet and power
supply box should also be moved to the right side of wall. See Fig 4 for details.
6. Move the
Tray (06)
to the assemble area. Be advised assemble area must to be as
close to the installation area as possible to make the movement of the assembled cabin
easy. Apply silicone sealant along the holes on the tray. Connect the
Back panel (02)
and the tray with
Bolt M6×40 (22)
. See Fig 5 and Fig 6 for details.
NOTE: For steps 6, 7 and 8, it will be necessary to apply silicone sealant between
the panels and the panels and tray.
7. Connect the
Back panel (02)
and the
Side panel (03)
with
Bolt M6×20 (with nut,
washer) (23)
. Secure the side panel to the tray with
Bolt M6×40 (22)
. (In these
instructions the panel is shown on the right side of the tray, but for reverse installation -
the side panel can also be installed on the left of the tray). See Fig 7 for details.
8. Connect the
Shelf panel (04)
and the
Back panel (02)
with
Bolt M6×20 (with nut,
washer) (23)
. Secure the shelf panel to the tray with
Bolt M6×40 (22)
. See Fig 8 for
details.
9. Secure the shelf panel and the
Control panel (05)
with M6×20 bolts; then secure the
control panel to the tray with
Round head screw
ST4.2×25 screws (17)
. See Fig 9 for
details.
Install the
Wide stationary glass (07)
to the side panel with
Bolt M6×16 (24)
. Apply
silicone sealant between the side panel and the aluminum profile. See Fig 10 and Fig 11
for details.
10. Secure the
Narrow stationary glass (09)
to the control panel with
Round head screw
ST4.2×12 (16
). Apply silicone sealant between the control panel and the aluminum
profile. See Fig 12 and Fig 13 for details.
11. Locate the
Pivot bars (14)
,
Pivot assembly (25)
and
parts 26, 27, 28, 29, 30, 33
.
Confirm the direction of the opening of the door. For left hinge installation 3 holes on
the pivot bars should be on the left; for right hinge installation 3 holes on the pivot bars
should be on the right side. Connect the stationary glass panels with pivot bars using
the
Glass bracket (30), Flat head bolt M8×20 (28)
and
Washer (29).
Do not forget
to place the clear rubber
Gasket (26)
between the pivot bars and the glass to
prevent contact of the glass to the metal. See Fig 14/1, 14/2 for details.
12. Fasten
Pivot assemblies (25)
to the pivot bar using
Round head bolt M8×14 (27)
.
See Fig 14/3 for details.
Rev. 1. 3.
6
Содержание DreamLine Neptune
Страница 9: ...Fig 5 Fig 6 Fig 7 Fig 8 1 2 1 2 Rev 1 3 9...
Страница 10: ...Fig 9 Fig 10 Fig 11 Fig 12 1 2 1 2 3 3 Rev 1 3 10...
Страница 11: ...Fig 13 Fig 14 Fig 15 Fig 16 1 2 3 4 5 1 2 3 3 Rev 1 3 11...
Страница 12: ...Fig 17 Fig 18 L L Fig 19 Fig 20 1 2 3 4 5 6 7 8 Rev 1 3 12...
Страница 13: ...11 16 Fig 21 Fig 22 L1 L2 N L1 L2 N Fig 23 Fig 24 6 1 2 3 4 5 Blue Red Cool Red Rev 1 3 13...
Страница 14: ...Fig 25 Fig 26 Fig 27 Fig 28 1 2 3 1 2 1 2 3 1 2 3 Rev 1 3 14...