background image

tm

STANDARD & DUAL POWER PACKAGES

Specifications subject to change.

07/20

L392-0109A

REPLACEMENT PARTS

INSTALLATION

ASSEMBLY

Over-Center  Solar / Hydraulic Boat Lifts

866.GoBasta

www.gobasta.com

©  Basta, Inc.     2020

Содержание Over-Center

Страница 1: ...STANDARD DUAL POWER PACKAGES Specifications subject to change 07 20 L392 0109A REPLACEMENT PARTS INSTALLATION ASSEMBLY Over Center Solar Hydraulic Boat Lifts 866 GoBasta www gobasta com Basta Inc 202...

Страница 2: ...Occasionally wipe the solar panel with a clean damp cloth to preserve its charging performance Every 6 months we recommend Inspect the hoses cylinders and fittings for leaks and wear Check the wire te...

Страница 3: ...ith a 10 amp charger and check the charge again 5 Have the battery tested It may be old and require replacement 6 If the lift is being used frequently during the day it may be necessary to use a 110 v...

Страница 4: ...Solar Controller shown above left NO GAP Prevent unauthorized use KEEP BOX LOCKED 2 COMPLETE POWER PACKAGE H653 0013 power switch POSITIVE BATTERY CABLE RED R711 1010 NEGATIVE BATTERY CABLE BLACK R711...

Страница 5: ...4 ENCLOSURE C243 0003 R812 0011 Y354 0001 R283 0002 Solar Controller Connect to Solar Panel Connected NOTE REMOVE SHIPPING PLUG IN RESERVOIR AND REPLACE WITH BREATHER PLUG BEFORE START UP NOTE REMOVE...

Страница 6: ...c Power Unit will arrive fully assembled Make sure all the connections are snug to prevent leaks or loss of power to the unit 2 Install a Group 31 Deep Discharge AGM battery as shown Be sure to connec...

Страница 7: ...arness CONTROL PANEL ASSEMBLY R815 0011 Please order replacement parts by PART NO and DESCRIPTION USE ONLY BASTA BOATLIFTS BIODEGRADABLE HYDRAULIC FLUID OIL INJECTED INTO THE SKIN FROM HIGH PRESSURE L...

Страница 8: ...natural disaster or acts of God abuse misuse overloading out of level or improper boat loading i e not fully on too far on or crooked on lift or 2 faulty assembly or installation in the event such as...

Отзывы: