
BaseStation 3200 Advanced Irrigation Controller Manual
Page
56
Setting Up Event Days
The BaseStation 3200 supports eight event days. An event day stops all watering and keeps all programs from
starting on that date. You can schedule an event day up to a year in advance.
To add a new event day
1.
Turn the dial to the
Event Days
position.
2.
Press the
NEXT
or
PREV
button to move to an empty event day box.
3.
Press the
+
or
–
button to set the desired date.
4.
When you have finished making changes, turn the dial to the
Auto Run
position.
To edit existing event days
1.
Turn the dial to the
Event Days
position.
2.
Press the
NEXT
or
PREV
button to move to an event day box.
3.
Press the
+
or
–
button to set the desired date.
4.
When you have finished making changes, turn the dial to the
Auto Run
position.
To remove an event day
1.
Turn the dial to the
Event Days
position.
2.
Press the
NEXT
or
PREV
button to move to an event day box.
3.
Press the
CLR
button to remove the date.
4.
When you have finished making changes, turn the dial to the
Auto Run
position.
Содержание BaseStation 3200
Страница 8: ...Page vi...