USE AND MAINTENANCE MANUAL
2-Speed Gearboxes Series CE
M
.CE.GEN.ENG.DOCX
Issued
2018
Rev.03
Page 25 / 59
•
SCREWING THE PINION ON THE MOTOR SHAFT
With the pinion inserted as described above, drill a hole in the pinion and in the motor shaft as shown
below. This operation should not be performed with the '
special version'
as described in
"step 2"
.
After drilling the hole, place the O-ring (09d) on the pinion spot-facing and tighten the locking screw
(09c) until the screw head is in contact with the pinion.
Assembling dimension 'Y'
CE 12
101.5 mm
CE 14-15
138 mm
Size
Ø A mm B mm
CE 12
6.75
4
CE 14-15
8.5
5
Option '
a'
(see "Step 1")
A
B
Make sure that the pinion is completely
inserted on the motor shaft.
09c
09d
09c + 09d
Option '
b'
and '
c'
(see "Step 1")
Step 3
After fitting the pinion, it is necessary to screw it to the motor shaft.
Before this operation, check the dimension Y according to the drawings/chart below.
Y
Y
Содержание CE 11
Страница 2: ...USE AND MAINTENANCE MANUAL 2 Speed Gearboxes Series CE M CE GEN ENG DOCX Issued 2018 Rev 03 Page 2 59 ...
Страница 43: ...USE AND MAINTENANCE MANUAL 2 Speed Gearboxes Series CE M CE GEN ENG DOCX Issued 2018 Rev 03 Page 43 59 ...
Страница 47: ...USE AND MAINTENANCE MANUAL 2 Speed Gearboxes Series CE M CE GEN ENG DOCX Issued 2018 Rev 03 Page 47 59 ...
Страница 51: ...USE AND MAINTENANCE MANUAL 2 Speed Gearboxes Series CE M CE GEN ENG DOCX Issued 2018 Rev 03 Page 51 59 ...
Страница 53: ...USE AND MAINTENANCE MANUAL 2 Speed Gearboxes Series CE M CE GEN ENG DOCX Issued 2018 Rev 03 Page 53 59 ...