14
ENGLISH
GB
8.8.
Inspection (service technician)
Before starting the device the installation check-
up should be run to evaluate the working
conditions of every single component and
recognize any errors.
To check the
heating plate
it is recommended to
perform the following inspections:
1.
Open the gas valve and check the tightness of
connections;
2.
Check correct ignition and combustion of gas
burners;
3.
Check and adjust, if necessary, the gas
pressure and flow rate in Max and Min
positions (see relevant section).
4.
Check if the safety thermostat operates
properly.
5.
Check gas lines for gas leaks.
To check the
electric oven
it is recommended to
perform the following inspections:
1.
Check that the energy supply voltage is the
same as of the device voltage.
2.
Turn on the automatic switch-off to check the
electrical connections.
3.
Check that the protection devices work
correctly.
9.
SETTINGS (service technician)
Before setting the device switch
on all protection devices.
First of all, close the gas valve and
prevent access to the device, which in
case of activation may lead to
unexpected situations endangering the
safety and health of people.
9.1.
Minimum setting of the heating plate burner valve
These settings are required only if the connected
gas type differs from the factory preset and
checked gas, after switching to the different gas
type. Before performing this setting check whether
the gas pressure is compliant with the value of
nominal pressure (see table in the appendices).
Follow the instructions below.
1.
Close the gas cut-off valve.
2.
Pull the control knob (
A).
3.
Unscrew screws
B
and remove the
control panel (
C
).
4.
Remove the injection nozzle
D
and
replace it with the one suitable for used
gas type (see appendices). After setting
tighten the screw.
5.
Finally reinstall the control panel (
C
) and
control knob (
A
).
D
C
A
B
ID 09
ID 13
Содержание FAE92M00
Страница 19: ...I ANLAGEN ATTACHMENTS ANNEXES ALLEGATI ANEXOS ANEXOS BIJLAGEN ZA CZNIKI...
Страница 31: ...XIII NOTE...