Installation Instructions
16 / 26
296677
EN
Reception and Operation Control
When connections are established, it is necessary to check the appliance, the entire
installation and operation of the appliance.
In particular, check:
– if the entire protective film was carefully removed from all external
surfaces;
– if the protective body of the connection clamp that was disassembled for
the purpose of establishing electric connections was re-installed;
– if all connections were executed pursuant to this installation instruction;
– if all standards and safety regulations, legal acts and recommendations
in force have been observed and met;
– if water connections are tight;
– if power cord is not subject to tensile stresses nor in contact with hot
surfaces;
– if voltage of the switched on appliance deviates by ±10% at maximum
from the rated voltage provided on the rating plate.
Prepare and fill in completely the reception protocol and submit it to the client for
signing.
The warranty period starts from the moment of signing of this protocol.
To end with, start the appliance in order to check its operation, following indications
in section 'Appliance Start-up'.