![Bartscher 100083 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/bartscher/100083/100083_original-instruction-manual_476820015.webp)
Installation and operation
100083
13 / 19
EN
6. Fill the water tank with fresh drinking water, up to 'FULL' marking.
7. Wait a short while and run the production process, using ON/OFF switch to this
end.
CAUTION!
To provide for proper hygiene, exchange the water in water tank every 24
hours.
The appliance automatically stops the production process when the storage
container is full.
The 'FULL ICE' indicator light is lit.
8. Open the storage container lid and use the ice shovel to take the ice cubes out
of the storage container.
When the ice cubes are removed, the production of ice is continued.
CAUTION!
Due to hygienic reasons, the ice cubes produced during the first
production process should be disposed of; do not use them to cool
beverages nor food products.
9. When the appliance is not to be used any more, it should be switched off with
the ON/OFF switch.
10. Unscrew the closing cover at the rear wall of the appliance and drain water from
the water tank.
NOTE: If the appliance will not be used for a prolonged time, drain the
water from both the main and bottom water tank, using the water drain at
the rear wall of the appliance to this end.
If the appliance is to be operated again after a longer break, conduct 2
–3
ice cubes production cycles using fresh water in order to remove bacteria.
The ice cubes produced in the process should be disposed of.
Содержание 100083
Страница 1: ...W150 100083 ...