Installation Instruction
(Translation)
RFID UHF Add-On Module
Type B7-A2Z0-0032
Technical data subject to change.
08/2016
EN 7/11
7.
Fasten the RFID UHF Add-On
Module using the six screws
supplied. Torque: 3 Nm.
8.
Visual inspection of the RFID UHF
Add-On Module to ensure correct
positioning and assembly.
9.
Switch the Agile X on using the
"ON/OFF" button.
Optional: Attach hand strap.
(Material No. 03-9849-0130)
10.
Loosen the top screw M3x7
that holds the RFID UHF Add-On
Module in place.
11.
Place the hand strap on and
fasten using the four M3x8
(supplied) pan head screws.
Torque: 3 Nm.
Do not assemble or remove the
hand strap in a potentially
explosive atmosphere.
DANGER
There is a risk of fatal injury in an
explosive atmosphere!
The hand straps may only be
used in areas with gas group
IIA.