Maintenance
79
03/2016
CFPP Process Analyzer CFPP-4.2
10.10 Changing the battery of the box PC
The analyzer is controlled by a box PC. It is located in the control box (see page Fehler!
Textmarke nicht definiert.). The box PC is equipped with a Lithium battery. During voltage
breakdown it ensures among other things, that the system clock carries on running. To
ensure the functionality of the box PC, you should change the battery every five years.
WARNING!
Danger of explosion by changing the battery in potentially explosive
atmosphere!
Dismounting and installing the battery can cause sparks. They can ignite
potentially explosive atmosphere!
FOR THIS REASON:
-
Make sure, that during all operations for changing the battery no
potentially explosive atmosphere is present.
For changing the battery you must open the control box.
•
For it switch off the analyzer (see page 65).
•
Make sure, that the power supply is switched off.
•
Open the control box.
WARNING!
Danger of explosion by using unsuitable batteries in potentially explosive
atmosphere!
Unsuitable batteries can ignite potentially explosive atmosphere by
overheating in the event of an error!
FOR THIS REASON:
-
For replacement use only batteries from BARTEC BENKE.
Содержание CFPP-4.2
Страница 1: ...CFPP Process Analyzer CFPP 4 2 Operating Instructions 395778MDHEN A 03 2016 ...
Страница 6: ...IV Contents CFPP Process Analyzer CFPP 4 2 03 2016 ...
Страница 7: ...General 5 03 2016 CFPP Process Analyzer CFPP 4 2 1 General ...
Страница 9: ...Safety 7 03 2016 CFPP Process Analyzer CFPP 4 2 2 Safety ...
Страница 25: ...Introduction 23 03 2016 CFPP Process Analyzer CFPP 4 2 3 Introduction ...
Страница 28: ...26 Introduction CFPP Process Analyzer CFPP 4 2 03 2016 ...
Страница 29: ...Technical Data 27 03 2016 CFPP Process Analyzer CFPP 4 2 4 Technical Data ...
Страница 33: ...Analyzer Description 31 03 2016 CFPP Process Analyzer CFPP 4 2 5 Analyzer Description ...
Страница 43: ...Transport Packaging and Storage 41 03 2016 CFPP Process Analyzer CFPP 4 2 6 Transport Packaging and Storage ...
Страница 46: ...44 Transport Packaging and Storage CFPP Process Analyzer CFPP 4 2 03 2016 ...
Страница 47: ...Installation and Disassembly 45 03 2016 CFPP Process Analyzer CFPP 4 2 7 Installation and Disassembly ...
Страница 55: ...Initial Operation 53 03 2016 CFPP Process Analyzer CFPP 4 2 8 Initial Operation ...
Страница 64: ...62 Initial Operation CFPP Process Analyzer CFPP 4 2 03 2016 ...
Страница 65: ...Operation 63 03 2016 CFPP Process Analyzer CFPP 4 2 9 Operation ...
Страница 69: ...Maintenance 67 03 2016 CFPP Process Analyzer CFPP 4 2 10 Maintenance ...
Страница 102: ...100 Maintenance CFPP Process Analyzer CFPP 4 2 03 2016 ...
Страница 103: ...Troubleshooting 101 03 2016 CFPP Process Analyzer CFPP 4 2 11 Troubleshooting ...
Страница 107: ...Troubleshooting 105 03 2016 CFPP Process Analyzer CFPP 4 2 ...