RDG603A17 – Issue 1 – Shire 30_40_50 WB/RB Manual
Page 16 of 51
11. Coolant
•
Prepare coolant mix of 50% clean tap water and 50% antifreeze.
For Workboats:
•
Ensure the top header tank connection goes to the small hole connection on the
tank.
•
To fill the engine cooling system for the first time:
•
For the Shire 30WB and 40WB fill the system through the header tank filler
cap.
•
For the Shire 50WB fill the system through the exhaust manifold filler cap and
then through the header tank. Note: The water cooled exhaust manifold is an
option for the Shire 40WB.
•
After filling up the cooling system, start and run the engine for several minutes to
dispel any remaining air bubbles with the pressure cap removed.
Note: After running the engine for the first time, stop the engine and monitor the water level
frequently as trapped air bubbles may be expelled. Top up the system as necessary.
Figure 5: Shire 50 Coolant Filling Points
For Riverboats with Water Cooled Manifold:
•
Remove filler cap on top of water cooled manifold and fill cooling system through
here.
•
Run the engine at idle for a few minutes with cap removed to ensure air is removed
and allow a 13mm (1/2”) air gap in top of manifold to allow for expansion.
12. Control Cables
•
Connect engine speed control cable. With the engine off, ensure that the engine
Exhaust Manifold Filler Cap
Header Tank Filler Cap
Содержание Shire 30 RB
Страница 27: ...RDG603A17 Issue 1 Shire 30_40_50 WB RB Manual Page 27 of 51 SECTION 5 Service Procedure ...
Страница 40: ...RDG603A17 Issue 1 Shire 30_40_50 WB RB Manual Page 40 of 51 2 Standard Control Panel Wiring Diagram ...
Страница 41: ...RDG603A17 Issue 1 Shire 30_40_50 WB RB Manual Page 41 of 51 3 Deluxe Control Panel Wiring Diagram ...