QuadAir Multiplayer Hockey Table
Instruction Manual
6
For assistance call:
1+(716) 866-0054
Installing the Optional QuadAir LED Topper
1.
Carefully remove the topper from the packaging.
2.
Located the power cord coming from the Topper Light Assembly. Feed the power cord through one of the
Metal Support Arms (the power cord should come out of the end with the round bracket on it).
3.
Connect all 4 support arms to the Topper Light Assembly. Insert 4 bolts into each of the brackets and
tighten with the included allen wrench.
Insert 4 Bolts into Topper Light Assembly holes and tighten.
4.
Install the Mallet Holders onto each of the Metal Support Arms. There are two bolts for each mallet holder
that need to be installed.
Insert 2 Bolts into the Metal Support Arm holes and tighten.
5.
You will need to remove the old corners and replace them with the new corners provided in the LED
Topper kit.
a. Start by removing the rubber trim from the table.
b. Loosen the rails to remove the original corners. You will need to remove bolts from corner and metal corner support.
c. Now put the new LED Topper corners on with the bolts from the original mallet holder corner. Next retighten the rails.
d. Next put back the rubber trim. You will need to cut the rubber to fit in between the corners. You can use the LED Topper as a
guide or measure from the edge of the rail.
6.
You will need 4 people for this next step. Each person will grab a support
arm and lift the entire LED Topper onto the QuadAir table. Make sure to
run the LED topper power cord through the hole on the corner piece
before you set the topper down.
7.
Once the entire topper assembly is on the table insert the 4 bolts into the LED Topper Corner Piece
Insert 4 Bolts into the LED Topper Corner Piece.
Cut the rubber trim to end 1/4” inside the edge
of the metal bracket.
DO NOT TAP POWER TO THE TABLE.
All card swipe and table accessories (toppers) must be powered independently.
Содержание 3207545-QAT
Страница 9: ......