background image

7

12

Repeat process from steps 2 to 9 until all fence panels and posts have been installed.

13

Apply glue on inside rim of post caps then attach to posts.

Содержание 73010949

Страница 1: ...0991 73010997 73011003 73011009 73011015 73012814 73012815 Vinyl Fence Assembly and Installation Instructions PLEASE READ ASSEMBLY INSTRUCTIONS COMPLETELY BEFORE STARTING ALL STATED SIZES ARE NOMINAL DIMENSIONS For French and Spanish instructions go to www barretteoutdoorliving com 34106377BOM V1 03 11 ...

Страница 2: ...ons may regulate the location style and height of your fence or even require a permit signoff beforehand Contact your local utilities companies You must have the utility companies clearly mark your property for electrical gas or water lines to avoid puncturing any unseen underground utilities Pay to mark your property line Being proactive will save you time and money from any disputes from neighbo...

Страница 3: ...r 5 Posts 94 Rail Cut Length 91 96 Center to Center 5 Posts 94 Rail Cut Length 91 Wet or Dry Mix Concrete Aluminum Insert Reinforcement 2 10 3 14 60 35 31 96 Recommended 36 Recommended 96 Center to Center 5 Posts 94 Rail Cut Length 91 Wet or Dry Mix Concrete Aluminum Insert Reinforcement 2 10 3 14 72 47 43 108 Recommended 36 Recommended 96 Center to Center 5 Posts 94 Rail Cut Length 91 Wet or Dry ...

Страница 4: ... of the holes 3 If frost line exceeds 30 dig hole to the appropriate depth and then add 6 of gravel for post drainage Add concrete according to manufacturers instructions until a depth of 30 remains Set post in hole ensuring it is plumb and level Fill hole with concrete according to manufacturers instructions Go to step 5 4 If frost line does not exceed 30 insert 6 of gravel into bottom of both ho...

Страница 5: ... 6 Next attach U Channels to boards If assembling Red Cedar panels you must screw U Channels to post first and then add boards 7 Insert boards into bottom rail ensuring U Channels are on both ends 8 Add the side channels to the sides and the lattice insert over the top of the lattice Place into the middle rail followed by the top rail ...

Страница 6: ... the route holes of the second fence post Plumb and level the post and add concrete according to manufacturers instructions 11 Check to ensure the second Post is level then measure panel plus add dimensions from center of 2nd post to center of next and dig the third post hole accordingly Center to Center Post Distance ...

Страница 7: ...7 12 Repeat process from steps 2 to 9 until all fence panels and posts have been installed 13 Apply glue on inside rim of post caps then attach to posts ...

Страница 8: ... a convenient time to schedule an onsite inspection if need be If after onsite inspection product is deemed to be manufacturer defect we will make arrangements to rectify the issue You must have proof of your purchase in order for the problem to be corrected Transferee Coverage Warranty coverage will be extended to transferees on the above listed products with the following limitations Transferee ...

Отзывы: